Home › Shop › Education & Childcare Buildings › 18.9m × 12.6m Modular Classroom Building – KC Bespoke

18.9m × 12.6m Modular Classroom Building – KC Bespoke

£423,885.00+ VAT — £508,662.00 incl. VAT

18.9m × 12.6m modular classroom building from KC Bespoke, with a 238.14m² stated footprint for a planned school teaching and support layout. The package includes insulated steel-frame construction, internal partition panels, scheduled FD30 doorsets and sanitary fittings, triple-glazed laminated UPVC windows, Class 42 SPC flooring and air-to-air heat-pump heating and cooling.

Stated overall dimensions
18.90m × 12.60m
Calculated footprint
238.14m²; not net teaching or dining area
Construction
KC Bespoke steel-frame modular building
Internal fit-out
Partitions, floor finish and sanitary specification to agreed schedules
Windows
Triple glazing with laminated safety glass
Heating & cooling
Included air-to-air heat pump; specified SCOP 4.5
School layout
Teaching, support or canteen brief developed through approved drawings
Delivery & assembly
Scope and price inclusion to be agreed
Product price £423,885.00 + VAT £508,662.00 incl. VAT
Order total £423,885.00 + VAT £508,662.00 incl. VAT
Availability Available to order

The supplied £423,885 is treated as excluding VAT, following the established listing convention; confirm this basis before publication. The price covers the stated school-building specification, not classroom furniture or a fully equipped canteen. Delivery, offloading, lifting, assembly, site works and final connections are not confirmed inclusions. Zero delivery fields are unset additional charges, not free shipping. Agree the selected layout, complete services, logistics and final order total before payment.

The approved school layout defines room sizes, usable area and any pupil or dining capacity. Desks, teaching equipment, canteen furniture and catering equipment are not included unless itemised. Electrical, lighting, ventilation, acoustic treatment and logistics require agreed schedules. A canteen layout is an alternative or coordinated mixed-use design, not an additional fully equipped facility included automatically.

Available to order

KC Bespoke | School teaching and support accommodation | 238.14m²

A modular classroom building designed around your school brief

Create dedicated accommodation for teaching, learning support and school services with this 18.9m × 12.6m building. Its 238.14m² overall footprint can be developed into an agreed arrangement of teaching rooms, circulation, storage and sanitary accommodation, with a defined insulated building package and included heat-pump climate control.

The supplied price of £423,885 is treated as excluding VAT. It covers the stated building specification, not land, loose furniture, teaching resources or a complete catering installation. Confirm the final layout, selected specialist systems and delivery scope before agreeing the full project total.

Use the finished internal floor plan to allocate teaching rooms, learning-support space, staff facilities and storage. No number of classrooms, pupils, staff, desks or dining seats is inferred from 238.14m². A classroom-led plan and a canteen-led plan have different space and service requirements; the quoted layout must identify what is actually provided.

The same KC Bespoke package is retained: protected steel framing, Kingspan external wall panels or an agreed equivalent, 100mm internal partition panels, a 160mm specified roof assembly with Protan SE 2.0 membrane, an 18mm cement-bonded chipboard deck and Class 42 SPC flooring. UPVC windows have triple glazing with laminated safety glass; entrance doors are aluminium.

The included sanitary specification and heat-pump system are scheduled for the selected school layout. Heating/cooling capacity, unit quantities, sanitary provision and service distribution must suit the larger building rather than repeat the equipment quantities of the preceding product.

For temporary classroom buildings during refurbishment or a phased estate project, agree the installation period, connections to existing facilities, access and future reuse strategy. Temporary use does not make the building a hire offer, guarantee an installation date or establish a planning exemption.

A school considering a portable canteen for sale can request a dining-focused layout using the same construction package. Serving arrangements, meal preparation, washing-up, kitchen extraction, food-storage equipment and furniture must be separately coordinated. A classroom configuration does not become an equipped kitchen or dining hall through a keyword alone.

School-specific design checks are separate from the supplied material schedule. DfE BB 93 guidance addresses school acoustics, while DfE BB 101 guidance covers ventilation, thermal comfort and indoor air quality. These references do not certify this product or add unlisted equipment to the price.

Browse modular classrooms and dining halls and school canteens, or download the KC Bespoke Collection catalogue (PDF). Send the school postcode, required uses and proposed room brief for a coordinated layout and complete quotation.

18.9m × 12.6m footprint 238.14m² stated area Triple-glazed laminated windows Class 42 SPC flooring Partitions & sanitary specification Included heat-pump climate control
Stated overall dimensions
18.90m × 12.60m
Calculated footprint
238.14m²
Specified wall / roof / floor U-values
0.18 / 0.11 / 0.11 W/m²K
Specified window U-value
0.9 W/m²K
Specified entrance-door U-value
1.1 W/m²K
Heating & cooling
Air-to-air heat pump; specified SCOP 4.5

Applications and layout options

Schools and academy trusts

Modular Classroom Accommodation

Develop dedicated teaching and learning-support accommodation around the school brief. Room dimensions, storage, circulation, sanitary facilities and teaching equipment are coordinated before the layout is approved.

Refurbishment and phased school works

Temporary Classroom Buildings

Plan replacement or additional teaching premises while other areas are unavailable. Agree the site programme, pupil routes, safeguarding arrangements and final utility connections; no fixed lead time or hire service is implied.

School estate projects

Modular Building for Schools

Consider classrooms, small-group teaching, staff or support accommodation within an agreed layout. Specialist science, practical-teaching or sensory-room equipment is not included merely because the building is intended for education.

Alternative dining brief

Portable Canteen for Sale

Develop a school dining or canteen layout as a separately agreed application of the building package. Canteen furniture, servery equipment, kitchen appliances, specialist finishes and extraction need their own scope and quotation.

Indicative product specification

Use this table as a configuration guide. The written quotation and approved drawings control the final product, interfaces and project-specific compliance.

Modular classroom — dimensions and purchase basis
Product line KC Bespoke steel-frame modular building
Stated overall dimensions 18.90m × 12.60m; final dimension basis and finished measurements to approved drawings
Calculated footprint 238.14m² from the supplied dimensions; not net teaching, learning-support or dining area
Heights and transport sections Internal and overall heights, module division, transport dimensions, weights and lifting details to project drawings
Purchase scope School-building purchase, available to order; no hire rate, land, existing school or education-service business included
Layout basis Teaching, circulation, storage, staff and sanitary accommodation to the approved room schedule; canteen use is an alternative or coordinated mixed-use brief
Capacity No classroom, pupil, workstation, dining-seat or fixture count is assigned from the footprint
Modular building for schools — room and circulation planning
Teaching spaces Agree school phase, intended subjects, teaching style, room sizes and furniture layout before assigning rooms
Learning support Review small-group or support-room needs and any specialist requirements; no dedicated specialist equipment package is supplied
Circulation and supervision Coordinate internal routes, arrival, staff sightlines, storage and movement between rooms without treating circulation as teaching area
Sanitary facilities Retain the supplied sanitary specification; agree age-appropriate fittings, fixture counts, handwashing and accessible provision through the final schedule
Storage and staff needs Allocate teaching-resource, coat/bag, cleaning and staff space in the measured layout; loose cabinets and furniture are not automatic inclusions
Access and evacuation Resolve thresholds, clear openings, accessible routes, fire strategy, escape and any link to the existing school as project-design matters
Alternative canteen arrangement Identify whether dining replaces teaching space or shares the building. Do not imply both a full classroom scheme and a separate full canteen fit within the same area and price
1. Steel structural frame and build quality
Primary frame High-strength closed steel profiles
Protection Anti-corrosive coating to structural steel
Manufacturing approach Factory-prepared modular construction with engineered alignment and connections
Engineering Frame design, applicable EN references, member sizes, support reactions, module connections and lifting details to project-specific documentation
Scope of evidence No execution class, stacking capability, floor load or certificate number has been supplied for this model
2. External wall panels and supplied performance references
Panel family Kingspan KS1000/1150 TL panels or agreed equivalent
Specified wall U-value 0.18 W/m²K
Reaction-to-fire reference EN 13501-1 B-s2,d0, as supplied for the panel system
Fire-resistance references EW 45 (o↔i) — stated 4m; EI 30 (o↔i) — stated 7.5m, as supplied
Acoustic reference 25 (-3,-5) dB as supplied for the panel; not a completed-classroom or room-to-room acoustic rating
Installation Vertical or horizontal where supported by the chosen system documentation
Mineral-wool option A mineral-wool-core alternative may be separately selected; it is not assumed to be the standard QuadCore core
Evidence Confirm wall panel thickness, span, orientation, fixings, junctions and supporting test evidence for the exact selected product
3. Internal wall panels
Partition system Kingspan QuadCore KS1150TL, 100mm
Finish Double-sided white finish
Included layout basis Internal partition panels to the agreed school room schedule; no wall length or room count is supplied
Cleaning and acoustic design Agree cleaning-product compatibility and any additional acoustic treatments; the panel description does not establish a maintenance-free or soundproof room
4. Roof system and Protan membrane
Insulated assembly Kingspan QuadCore KS1150TL, 160mm, specified within the roof build-up
Specified roof U-value 0.11 W/m²K
Membrane Protan SE 2.0
Membrane characteristics UV-resistant, flame-retardant membrane with welded seams as described in the brief; detail to the selected system
Assembly coordination Confirm panel suitability, structural supports, substrate, membrane compatibility, falls, outlets and roof-edge details for the complete assembly
Solar provision Solar equipment is not itemised. Any solar installation requires an agreed structural, fixing and membrane-compatibility review
5. Insulated floor and SPC school flooring
Structure Insulated steel floor system
Specified floor U-value 0.11 W/m²K for the completed floor assembly, not the steel frame alone
Deck 18mm cement-bonded chipboard
Finish SPC rigid-core vinyl flooring
Use classification Class 42 as supplied
Appearance Wood or stone texture selected from the agreed flooring range
Water resistance Waterproof SPC product; joints, edges and penetrations follow the selected installation system, not a whole-room tanking guarantee
School-use floor selection Class 42 SPC remains the supplied base finish. Confirm slip performance, cleaning compatibility and equipment loads for teaching, circulation, sanitary and any selected dining or food-preparation zones. Any specialist floor system must be explicitly designed and quoted; no blanket school-kitchen suitability or numerical floor-load rating is supplied.
6. Aluminium doors and triple-glazed UPVC windows
Entrance doors Aluminium entrance-door system with customisable RAL colour and high-security locking
Specified entrance-door U-value 1.1 W/m²K
Window frames Multi-chamber UPVC
Window glazing Triple glazing with laminated safety glass
Specified window U-value 0.9 W/m²K
Opening schedule Counts, sizes, positions, opening types, clearances, thresholds and hardware to the approved drawings
Door glazing The triple-glazing statement applies to windows; any entrance-door glazing must be confirmed in the door schedule
Glazing performance Confirm the laminate build-up and safety classification. No universal UV-blocking percentage, forced-entry rating, sound reduction or storm-resistance result is asserted for unspecified glazing
7. Internal fire doors
Fire rating FD30 doorsets to the approved fire and opening schedule
Smoke control Specify compatible smoke-control seals and hardware where required by the complete doorset and fire strategy
Acoustic properties Acoustic requirements and supporting doorset data to the schedule; no numerical performance supplied
Scope FD30 elements do not establish a whole-building fire-resistance rating
8. Sanitary areas and finishes
Toilets GEBERIT wall-hung toilets to the agreed sanitary schedule
Storage Quality under-sink cabinets
Wall finishes Rocko Tiles, 2800 × 1230 × 4mm, vertical format
Wet-area detailing Waterproof, easy-clean finishes with compatible joints, edges and sealed penetrations
Quantities and accessibility Fixture counts, room layout, basin provision, door clearances and accessible arrangements to the agreed plan; no fixture count is inferred
Services Define water supply, hot-water equipment, temperature control, internal drainage and external connection responsibilities
Equipment distinction The sanitary package does not include classroom furniture, laboratory or practical-teaching fixtures, a canteen servery, catering sinks, appliances or food-preparation equipment.
9. Heat-pump heating and cooling
Included system Air-to-air heat pump for heating and cooling
Specified SCOP 4.5, subject to the selected equipment and declared operating conditions
Equipment schedule Capacity, number of units, controls, indoor/outdoor positions, noise criteria and commissioning to the final school design
Supply distinction Included in this current building specification; not an optional carry-over from the earlier office package
Ventilation distinction The heat-pump description does not establish classroom fresh-air supply, ventilation controls or any selected kitchen extract and replacement-air package. These require separate design and an agreed services schedule.
10. External steel elevation panels
Cladding Hidden-fix steel elevation panels
Substrate Hot-dip galvanised steel
Design Cassette arrangement, flashings, openings and any signage fixing locations to approved elevations
Scope Base finish is the agreed steel-panel specification; premium façade materials remain optional
11. Included standard colours — cladding and flashings
RAL range 1015, 3000, 3009, 3011, 5010, 6029, 7016, 7024, 7035, 8004, 8017, 9002, 9006, 9007 and 9010
Other standard finish Galvanised
Pricing basis No surcharge for the listed standard steel-cladding and flashing finishes
Selection Confirm colour samples, distribution and final elevation treatment before manufacture; no product image or colour selection has been supplied for this school building
12. Optional wood-effect cladding
Options Golden Oak, Dark Walnut and Winchester
Commercial status Premium upgrade, separately quoted
Selection Agree the actual cladding product, exterior suitability, support details and coverage; the finish name does not establish timber-frame construction
13. Optional brick-slip and decorative-stone façades
Brick-slip options Nicea 1 NEW / Nicea; Boston 1 / Boston with joint; Bronx Red 1 on request / Bronx Red with joint; Cambridge 13 / Cambridge; Country 610 / Country; Dallas 1 NEW / Dallas with joint; Dublin 3 / Dublin with joint; Monsanto 1 / Monsanto with joint; Rustik 540 / Rustik
Decorative-stone options Alzano; Amsterdam; Calabria 1 / Calabria; California; Grenada 1 / Grenada; Jura 1 / Jura; Kenya 1 / Kenya; Lyon 1 / Lyon; Madera 2 / Madera; Mexicana 3 / Mexicana; Nepal; Palermo; Roma 1 / Roma; Sierra; Timber 1 / Timber; Toledo 2 / Toledo
Joint finish Jointed or unjointed where available for the selected product
Commercial status Optional premium upgrade; confirm product, quantities, coverage and price
Technical coordination Confirm exterior suitability, substrate, attachment, weather exposure, fire performance and movement details before manufacture
School acoustics, ventilation and comfort — external design guidance
Guidance status The following are external school-design references, not extra product inclusions or evidence that this building has already passed a school-specific assessment
Acoustics Use DfE BB 93: acoustic design of schools in the project review. The supplied panel acoustic figure alone is not classroom-performance evidence; any room treatment and evidence requirements must be defined.
Ventilation and summer comfort Use DfE BB 101: ventilation, thermal comfort and indoor air quality to inform the applicable design. Agree fresh-air provision and controls separately from the included heat-pump temperature control.
Teaching environment Coordinate daylight, glare, screen positions, blinds where required, lighting, room acoustics and the actual room-use pattern
Equipment and evidence Agree any additional acoustic panels, ceiling treatments, ventilation equipment, sensors, controls and checks in the technical and commercial schedules
Project standards The DfE school and college design and construction collection is a reference for the responsible school team and designers. Confirm applicability to the project and UK jurisdiction; no DfE approval or accreditation is claimed.
Portable canteen for sale — planning canteens in schools
Alternative application A dining or canteen plan can be developed using the same building specification, subject to layout, services and the agreed quotation. This does not automatically convert the classroom layout into an equipped canteen
Food-service model Establish whether meals are prepared on site, regenerated, delivered for serving, or supplied from another school kitchen before defining rooms and utilities
Dining and queues Plan seating, supervision, queueing, serving, clear routes and clearing-up from the measured internal area; no seat or meals-per-service count is supplied
Catering equipment Serving counters, kitchen cabinetry, catering sinks, cooking appliances, refrigeration, dishwashers, water treatment and dining furniture are separately specified
Extract and replacement air For cooking operations, HSE catering guidance is an external design reference. Canopies, ducts, extract, replacement air and fire/gas interfaces are not included merely by supplying the heat pump.
Food-use finishes and hygiene Review cleanable surfaces, washing facilities, drainage and the selected food operation with the appropriate specialist; Food Standards Agency premises guidance is a reference for England, Wales and Northern Ireland. Use relevant local guidance elsewhere. Specialist finish changes require a priced schedule.
Building price boundary The listed price covers the stated building package, not a complete school catering operation or a guaranteed capacity for meals
Electrical, water and school-equipment schedules
Electrical and lighting The inherited master specification does not itemise a complete electrical or lighting package. Agree power capacity, distribution, sockets, lighting, emergency systems, protection, testing and connection responsibilities
Teaching and communications equipment Desks, chairs, teaching walls, interactive screens, IT/network equipment, Wi-Fi, public-address systems and specialist subject equipment require an itemised scope
Included building services Scheduled sanitary fixtures and air-to-air heat-pump heating/cooling remain included. Hot water, full internal service routing and connections must be explicitly allocated
Security and safeguarding systems Alarms, CCTV, access control, intruder systems and site gates are not automatically included; agree interfaces with the school
Capacity and zoning Select heating/cooling zones, service distribution and sanitary quantities for this 238.14m² building and the actual room use, not by copying another model’s equipment counts
Handover Agree completion, commissioning, testing and documentation for the selected building and school-specific systems before occupation
Temporary classroom buildings — occupied-site installation
School operations Agree the construction work area, secure segregation, pedestrian routes, delivery access and interfaces with the operating school
Programme Manufacture and installation dates must follow approved drawings, site readiness and logistics. No holiday-only installation guarantee, fixed lead time or percentage time saving is supplied
Supports and utilities Groundworks, foundations, incoming supplies and final power, water, drainage and data connections require a separately allocated scope
Transport and lifting The 18.9m × 12.6m overall dimensions do not describe a single transport load. Confirm the module count, weights, joints, routes, handling and assembly method
Later relocation Temporary use can include a future relocation brief, but later dismantling, transport, reassembly, foundations and reconnection are separately reviewed and priced
Meaning of portable Not a claim of wheels, road-towability, daily relocation, hire availability or an automatic exemption from approval
Project approvals and supplied technical evidence
Part L reference The inherited brief references Part L 2021. Confirm applicability, the relevant standards and transitional route using Approved Document L guidance for England; no automatic approval is claimed.
Optional A energy rating An assessed design objective, not an issued EPC or guaranteed rating for this building
Planning and Building Regulations Review planning requirements and Building Regulations approval for the actual school site and relevant UK jurisdiction. Temporary construction does not itself determine the outcome.
School requirements The responsible school body and project designers must agree the applicable school-premises, accessibility, fire, acoustic, ventilation and operating requirements; no completed approval is represented by this listing
Evidence ownership Manufacturer declarations, calculations and test reports must match the selected products and assembled building. Manufacturer certificates do not become certificates held by KC Cabins Solutions Ltd
Performance limits The supplied U-values, panel fire/acoustic references, FD30 descriptions and SCOP are specification data, not independent certification of a completed classroom or canteen
Modular classroom price, delivery and handover
Price basis £423,885 treated as excluding VAT; £508,662 including the configured 20% VAT. Confirm the tax basis before publication
Delivery and assembly Transport, unloading, lifting, assembly, geographic coverage and associated charges are not confirmed inclusions. Agree them before payment
Detailed building schedule Approve the room schedule, quantities, openings, selected colours and all school-specific systems against the written quotation
Final project amount The building amount is not an all-inclusive equipped, installed and connected school-project total. Selected equipment, services and site works must be accounted for

Scope, responsibilities and assumptions

Included in the stated modular classroom building specification

  • 18.9m × 12.6m KC Bespoke steel-frame school building to approved drawings
  • High-strength closed steel profiles with anti-corrosive protection
  • External Kingspan KS1000/1150 TL panels or agreed equivalent, with specified wall U-value 0.18 W/m²K
  • 100mm Kingspan QuadCore KS1150TL internal partition panels, double-sided white, to the agreed layout
  • 160mm specified roof assembly with Protan SE 2.0 membrane and specified roof U-value 0.11 W/m²K
  • Insulated steel floor system with 18mm cement-bonded chipboard deck and specified floor U-value 0.11 W/m²K
  • Class 42 SPC rigid-core vinyl floor finish from the agreed selection
  • Multi-chamber UPVC windows with triple glazing and laminated safety glass to the opening schedule
  • Aluminium entrance doors with agreed RAL colour and high-security locking
  • FD30 internal doorsets to the agreed fire and opening schedule
  • GEBERIT wall-hung toilets, under-sink cabinets and Rocko Tiles finishes to the agreed sanitary schedule
  • Air-to-air heat-pump heating and cooling with specified SCOP 4.5, sized for the approved school design
  • Hidden-fix steel elevation panels and flashings in a listed standard finish

Separate school equipment, specialist systems and site scope

  • Desks, chairs, loose storage, teaching resources, interactive screens, computers, data equipment and specialist subject equipment unless itemised
  • Additional classroom acoustic treatments, fresh-air ventilation, controls, sensors and school-specific systems outside the agreed schedule
  • Complete electrical, lighting, hot-water and full service-distribution packages where not expressly identified in the order
  • Canteen dining furniture, serving counters, catering sinks, cabinetry, appliances, refrigeration, dishwashers and food-service equipment
  • Kitchen extract, canopies, ducts, replacement air, specialist hygienic finishes, grease management and any gas or specialist fire systems unless expressly scheduled
  • Premium wood-effect cladding, brick slips and decorative-stone façades
  • Groundworks, foundations, supports, site preparation and final mains connections
  • External ramps, steps, paths, canopies, covered links, play areas, fencing, gates and landscaping unless itemised
  • School signage, CCTV, access control, alarms, security and public-address equipment unless itemised
  • Land, property interests, statutory applications and professional services unless allocated in writing
  • Later dismantling, transport, relocation, reassembly and receiving-site connections

Order and school-design confirmations

  • Treat the supplied 423885 as £423,885 excluding VAT under the established pricing convention; confirm the basis before live publication
  • Confirm the overall measurement basis, internal usable areas, all heights, module division and transport details
  • Agree school phase, teaching use, support rooms and any dining/canteen brief without inferring capacity from 238.14m²
  • Retain the included partition panels, scheduled sanitary fit-out, FD30 doorsets and heat-pump climate control
  • Document the selected panels, complete roof/floor assemblies and supporting performance evidence
  • Agree the school-specific acoustic, ventilation, lighting, electrical, hot-water, access, fire and safeguarding interfaces
  • Define any canteen layout, food-service method and equipment as a coordinated and priced scope, not a second fully equipped facility added automatically
  • Agree transport, lifting, assembly, site-work allocation, service connections and the complete project price before payment
  • No product photographs, verified completed school project or measured floor plan were supplied for this configuration

£423,885 is treated as excluding VAT. Included partitions, sanitary fittings and heat-pump climate control follow the stated schedules. Classroom equipment, specialist school systems and canteen catering equipment are not automatic inclusions. Delivery and unitemised services are not free by default. The signed quotation and approved drawings define the final scope.

How the project progresses

  1. Define the school accommodation brief Send the postcode, school phase, intended teaching or dining use, room requirements, access constraints and target date.
  2. Develop the 18.9m × 12.6m layout Allocate teaching/support rooms or the selected canteen arrangement from measured internal space; coordinate sanitary facilities, storage, circulation and access.
  3. Coordinate specialist school systems Agree acoustics, ventilation, lighting, electrical/data, safeguarding interfaces and any selected catering systems alongside the included heating/cooling and sanitary packages.
  4. Approve specification and full quotation Confirm the £423,885 tax basis, quantities, finishes, equipment and the complete delivery, lifting, assembly, foundations and connection scope.
  5. Manufacture, install and hand over Prepare the site with agreed segregation from school activities, complete the contracted installation and connections, and supply the agreed checks and handover records before occupation.

Frequently asked questions

What is included in this modular classroom building?

The stated KC Bespoke package includes protected steel framing, insulated wall/roof/floor assemblies, 100mm partition panels, Class 42 SPC flooring, triple-glazed laminated UPVC windows, scheduled aluminium entrance and FD30 internal doors, sanitary fittings and finishes, and heat-pump heating and cooling. It is not a complete school furniture, teaching-equipment or catering package.

How much does the modular classroom cost?

The supplied £423,885 is treated as excluding VAT. At the configured 20% rate, VAT is £84,777 and the building amount including VAT is £508,662. Confirm the tax basis and all equipment, services, delivery and installation costs before agreeing the final project total.

What are the dimensions and pupil capacity?

The stated overall size is 18.90m × 12.60m, giving 238.14m² of footprint. This is not net teaching space. The final room plan, school phase, furniture, circulation, sanitary provision and project design determine capacity. No pupil count or number of classrooms is supplied.

Can this provide temporary classroom buildings during refurbishment?

Yes, a temporary-use brief can be developed around an agreed school site and programme. The purchase listing does not include hire terms, guarantee a school-holiday installation or establish a planning exemption. Site preparation, utilities and any later relocation require their own scope.

Can a modular building for schools include support and staff rooms?

Partitions and sanitary fittings are scheduled through the agreed layout. Support, staff, storage and teaching rooms can be considered within the available internal area, but room counts, dimensions, equipment and services must be approved. No particular layout is supplied by this listing.

Is a heat pump included and does it provide classroom ventilation?

Air-to-air heat-pump heating and cooling is included with specified SCOP 4.5. The source does not establish a fresh-air ventilation system. Agree the ventilation strategy, controls and equipment separately for the actual rooms and occupancy.

Does the panel acoustic rating prove that the classroom meets school acoustic requirements?

No. The inherited panel figure is not completed-room evidence. DfE BB 93 is an external school-acoustics reference for the project team. Define the applicable room requirements, additional treatment and evidence through the design; no BB 93 certification is claimed.

How will ventilation and summer comfort be assessed?

Agree fresh-air provision, glazing orientation, shading, heat gains, controls and the intended room use. DfE BB 101 guidance addresses school ventilation, thermal comfort and indoor air quality. This is a design reference, not a claim that the supplied heat pump alone satisfies those requirements.

Can the building be offered as a portable canteen for sale?

A school dining or canteen layout can be developed as an alternative or coordinated mixed-use plan. Serving equipment, cooking appliances, extraction, specialist kitchen finishes and dining furniture require separate schedules and pricing. The listed classroom package does not automatically include a fully equipped canteen.

What should be planned for canteens in schools?

Establish the food-service model, meal preparation or delivery arrangement, serving queues, seating, clearing-up, handwashing, storage and waste routes. The measured room layout and operating brief determine what fits; no dining-seat or meal-service capacity is assigned from the overall footprint.

Are canteen appliances and kitchen extraction included?

No catering inventory is itemised in the master building package. Agree appliances, servery counters, sinks, refrigeration, washing-up, extract and replacement air separately. HSE catering guidance is an external reference for kitchen ventilation design, not an included system.

What roof, insulation, glazing and floor specification is retained?

Walls are specified at 0.18 W/m²K; roof and floor at 0.11 W/m²K. The roof specifies a 160mm Kingspan QuadCore KS1150TL assembly with Protan SE 2.0. The floor uses 18mm cement-bonded chipboard and Class 42 SPC. UPVC windows are triple glazed with laminated safety glass, specified at 0.9 W/m²K, and aluminium entrance doors at 1.1 W/m²K. Evidence must match each completed assembly.

Are toilet fittings and internal partitions included?

Yes. The supplied package includes 100mm partition panels, scheduled GEBERIT wall-hung toilets, under-sink cabinets and Rocko Tiles finishes. Agree fixture counts, basin provision, age-appropriate and accessible arrangements, hot water and service interfaces through the final plan. No numerical fixture count is stated.

Are electrical installation, teaching screens and furniture included?

The source does not itemise a full electrical and lighting package. The order must allocate circuits, power, lighting, emergency systems, data and testing. Desks, chairs, cabinets, screens, computers and specialist teaching equipment are not automatic building inclusions.

Can I change the cladding colours and façade finish?

The listed standard steel-panel and flashing colours are included. Golden Oak, Dark Walnut and Winchester wood effect, plus the listed brick slips and decorative-stone systems, remain premium upgrades. Agree the material, coverage and samples before manufacture.

Is the standard flooring automatically suitable for a school kitchen?

Class 42 SPC is the retained base floor finish. It is not a universal kitchen slip, hygiene or chemical-resistance certificate. Review the actual wet, cooking, washing-up and cleaning conditions and equipment loads. Any specialist finish or floor-system change must be explicitly designed and priced.

Are delivery and assembly included?

Their inclusion, coverage and price have not been supplied. Agree transport sections, access, offloading, lifting, assembly and the full charges before payment. Zero delivery fields are unset amounts, not free shipping.

Can installation take place on an occupied school site?

Plan access, work-area segregation, pupil and staff routes, service interruptions and the programme with the school. Feasibility and timing depend on the actual site and agreed installation plan; no disruption-free or holiday-completion guarantee is made.

Does temporary construction remove planning or Building Regulations requirements?

No exemption is established by the description alone. Check planning and Building Regulations for the site and jurisdiction, alongside the responsible school body’s project requirements. No automatic school approval or issued A-rated EPC is supplied.

What is the lead time and can the building be moved later?

No fixed manufacturing or delivery period has been supplied. The programme follows design approval, site readiness and logistics. A later relocation requires structural, condition, connection, lifting and receiving-site review and is separately priced.

Where can I compare modular classroom and canteen options?

Browse modular classrooms and dining halls and school canteens, or download the KC Bespoke Collection catalogue (PDF). Compare each building’s actual schedule; wider-range examples do not add furniture or equipment to this price.

Plan your 18.9m × 12.6m modular classroom building

Send the school postcode, phase, required rooms, intended teaching or dining use and target date. Confirm the £423,885 tax basis and included building schedule, then agree school equipment, services, delivery, assembly and final connections.