ISO Frame Modular
Buildings UK
Factory-built, stackable to 3 floors, and fully relocatable. ISO frame modular buildings are delivered UK-wide in 8–12 weeks with full Building Regulations compliance as standard.
Site Offices & Welfare
Delivered in Days
ISO frame units provide compliant site offices, welfare facilities, and drying rooms for construction programmes. Furthermore, HIAB delivery eliminates the need for mobile cranes, reducing site setup time and cost.
Compliant Welfare Units
Buy or Hire
Purpose-built ISO frame welfare units include canteen, drying room, WC, and changing facilities as standard. In addition, all units meet CDM 2015 welfare requirements and are available on buy, hire, or hire-to-buy terms.
Modular Classrooms
Ready for September
ISO frame classrooms meet BB103 and Part L requirements for the education sector. Consequently, schools gain additional teaching space within a single half-term, without disrupting existing timetables or site operations.
A Proven Steel Frame System
Built for Speed & Flexibility
ISO frame modular buildings use a standardised steel corner casting system — the same connection technology used in global shipping containers. As a result, units are inherently strong, stackable, and transportable without specialist lifting equipment beyond a standard HIAB crane lorry.
Why Traditional Construction Falls Short
Traditional construction programmes routinely overrun on time and budget. Weather delays, subcontractor sequencing, and on-site quality variation all add risk to conventional build programmes. Furthermore, permanent structures cannot be relocated when business requirements change, locking clients into fixed assets regardless of operational need.
How ISO Frame Solves the Problem
ISO frame construction moves 90% of the build process into a controlled factory environment. Consequently, weather, subcontractor availability, and on-site conditions no longer dictate programme delivery. Each unit arrives on site 90% complete, requiring only services connection, external finishing, and snagging before handover.
- ✓ Standardised connections — ISO corner castings enable stacking to 3 floors and rapid HIAB positioning on any prepared surface
- ✓ Factory quality control — ISO 9001, ISO 1090, and ISO 3834 certified manufacturing throughout every stage of production
- ✓ Full relocatability — units can be lifted, transported, and reinstalled at a new site without structural alteration or loss of certification
- ✓ Buy, hire, or hire-to-buy — flexible procurement routes available for single units and large multi-unit programmes
The result: clients across the UK receive a fully compliant, fully fitted ISO frame modular building within 8–12 weeks of order confirmation — with no weather delays and no on-site quality surprises.
ISO frame steel corner casting system — the same technology used in global container logistics
Six Reasons Clients Choose
ISO Frame Construction
Each feature below is engineered specifically for clients who need compliant, high-quality modular buildings delivered faster and with less on-site risk than traditional construction.
8–12 Week Programme
Factory manufacturing runs in parallel with site preparation. As a result, the overall programme is significantly shorter than traditional construction, with handover typically achieved within 8–12 weeks from deposit and confirmed design.
Stackable to 3 Floors
ISO corner castings enable secure stacking to three floors without additional structural steelwork. Furthermore, each floor level is independently certified, enabling phased vertical expansion as your space requirements grow over time.
Fully Relocatable
Every ISO frame unit can be lifted by HIAB, transported on a standard low-loader, and reinstalled at a new site. Consequently, your modular building retains its full residual value and certification regardless of how many times it is relocated across the UK.
Energy-Efficient Envelope
KINGSPAN QuadCore insulated panels achieve wall U-values of 0.16–0.18 W/m²K as standard. In addition, roof insulation delivers 0.11 W/m²K, ensuring Part L compliance and significantly reduced operational energy costs throughout the building’s service life.
90% Factory Completed
Electrical first fix, internal lining, flooring, and joinery are all completed under controlled factory conditions before dispatch. Therefore, on-site installation typically takes just 1–5 days, minimising disruption to adjacent operations and eliminating weather-related programme risk entirely.
Buy, Hire, or Hire-to-Buy
ISO frame units are available on outright purchase, short-term hire, long-term hire, and hire-to-buy agreements. As a result, clients can access compliant modular space without the full capital outlay of a permanent building, with the option to convert hire payments into ownership at any point.
ISO 9001 · ISO 1090 · ISO 3834 Certified
Every ISO frame modular building is manufactured under triple ISO certification. Furthermore, Constructionline Bronze and SSIP accreditation confirm our commitment to quality, safety, and supply chain compliance across every project.
Three Specification Levels.
One Proven System.
Every ISO frame project has different performance requirements. As a result, we offer three specification levels to match your compliance obligations, budget, and programme timeline precisely.
ISO Frame Standard Specification
Our standard ISO frame specification delivers a fully insulated, electrically wired modular building suitable for offices, welfare, and storage applications. Furthermore, all standard units include KINGSPAN insulated panels, LED lighting, and consumer unit as standard.
Key Inclusions
ISO Frame REI60 Specification
Our REI60 specification adds 60-minute fire-rated panels, FD60 fire doors, and enhanced fire detection systems. Consequently, this configuration meets the fire safety requirements for education, healthcare, and multi-storey commercial applications under Part B of the Building Regulations.
Key Inclusions
ISO Frame Part L A-Rated Specification
Our highest specification combines REI60 fire rating with enhanced thermal performance, triple glazing, MVHR ventilation, and air-source heat pump heating. In particular, this configuration achieves EPC A-rating and exceeds current Part L 2021 requirements for new non-domestic buildings.
Key Inclusions
Quick Specification Comparison
| Feature | Standard | REI60 | Part L A-Rated |
|---|---|---|---|
| Wall U-Value | 0.25 W/m²K | 0.18 W/m²K | 0.16 W/m²K |
| Fire Rating | EI 30 | REI 60 | REI 60 |
| Windows | PVC double | Alu double | Alu triple (U 0.7) |
| Heating | Panel heaters | Panel heaters | ASHP (SCOP 4.5) |
| Ventilation | Natural | Mechanical extract | MVHR |
| Fire Doors | FD30 | FD60 | FD60 |
| Starting From | £18,000 | £28,000 | £38,000 |
All prices ex-works. Delivery, installation, and site preparation quoted separately. Prices subject to final specification and site survey.
Not sure which specification suits your project? Our technical team will advise on the most appropriate configuration based on your site, compliance requirements, and budget.
Discuss Your Specification →
ISO Frame Specification
Dimensions, Performance & Compliance
The table below covers standard ISO frame modular building parameters across all three specification levels. However, bespoke dimensions and enhanced specifications are available on every project.
| Parameter | Standard Range | Notes |
|---|---|---|
| Dimensions | ||
| External Width | 2.44m (8ft) – 3.66m (12ft) | Road-transportable without escort |
| External Length | 6.06m (20ft) – 14.6m (48ft) | Multi-unit linking for larger footprints |
| Internal Height | 2.4m – 2.7m | 2.7m standard on Part L A-Rated |
| Floor Area per Unit | 15m² – 53m² | Link units for 100m²+ configurations |
| Stacking | Up to 3 floors | ISO corner castings; each floor independent |
| Thermal Envelope | ||
| Wall U-Value | 0.16 – 0.25 W/m²K | KINGSPAN QuadCore panels; spec-dependent |
| Roof U-Value | 0.11 – 0.18 W/m²K | PVC PROTAN membrane; insulated deck |
| Floor U-Value | 0.11 – 0.16 W/m²K | PIR Thermano Deck insulation; SPC vinyl finish |
| Glazing | Double or triple glazed (PVC or aluminium) | U-value 0.7 – 1.4 W/m²K |
| Mechanical & Electrical | ||
| Electrical | UK 230V; RCD consumer unit; IP65 LED lighting | Emergency lighting on REI60 & Part L specs |
| Heating | Panel heaters (Std/REI60); ASHP (Part L) | SCOP 4.5 air-source heat pump on A-Rated |
| Ventilation | Natural (Std); Mech extract (REI60); MVHR (Part L) | Part F compliant across all specifications |
| Compliance & Certification | ||
| Building Regulations | Part L, Part B, Part M, Part F | Full documentation at handover |
| Structural Standard | ISO 1090, ISO 3834, ISO 9001 | Engineer sign-off included |
| Fire Rating | EI 30 (Std); REI 60 (REI60 & Part L) | FD30 / FD60 doors to match |
| Accessibility | DDA compliant layouts; low threshold doors | Part M compliant as standard |
| Programme & Warranty | ||
| Lead Time | 4 – 12 weeks from order | Subject to specification and programme |
| Installation Time | 1 – 5 days on site | 90% factory completed before dispatch |
| Structural Warranty | 10 – 15 years | Steel frame; extended terms for public sector |
| Panel & Roof Warranty | 5 – 10 years | KINGSPAN QuadCore manufacturer-backed |
| Windows & Doors Warranty | 5 years | Aluminium or PVC; all UK-standard hardware |
| Workmanship Warranty | 12 – 24 months | Internal fit-out and installation |
Specification Notice
All specifications are indicative and subject to final design, site survey, and Building Regulations approval. Furthermore, bespoke dimensions, enhanced thermal performance, and sector-specific compliance requirements are available on request. Contact our technical team for project-specific data sheets.
Download the Full ISO Frame Technical Data Sheet
Includes full U-value tables, structural load data, fire test certificates, and compliance documentation for all three specification levels.
Manufactured Under Certification
From Enquiry to Handover
in 6 Structured Stages
Every ISO frame modular building project follows the same proven delivery programme. Consequently, clients receive a fully compliant, factory-finished building within 8–12 weeks of order confirmation — with full visibility at every stage.
Enquiry & Technical Brief
Your project begins with a detailed technical brief. Our team reviews your site constraints, compliance requirements, programme, and budget to establish the most appropriate ISO frame specification from the outset.
Deliverables
Design & Quotation
Following the brief, our design team produces detailed floor plans, elevation drawings, and a full itemised quotation. In addition, all layouts are reviewed against Building Regulations Part L, Part B, Part M, and Part F before submission to the client.
Deliverables
Order Confirmation & Payment
Once the quotation is approved, a formal order is placed with a 40% deposit to release the manufacturing slot. Subsequently, the remaining 55% is invoiced prior to dispatch, with a 5% retention payable within 14 days of practical completion.
Deliverables
Factory Manufacture & QA
Manufacturing takes place entirely within our ISO 9001-certified factory. Each unit undergoes staged quality inspections covering structural welding (ISO 3834), panel installation, electrical first fix, internal fit-out, and final pre-dispatch sign-off before leaving the factory floor.
Deliverables
Delivery & Site Installation
Units are transported on standard low-loaders and craned into position using HIAB or mobile crane. Moreover, our installation teams complete all on-site connections — electrical, mechanical, and structural — within 1–5 days, minimising disruption to your site operations throughout.
Deliverables
Handover, Certification & Aftercare
Practical completion is confirmed with a full handover pack including as-built drawings, compliance certificates, warranty documentation, and operating manuals. Additionally, our aftercare team remains available for the duration of the warranty period to support any post-handover queries or remedial works.
Deliverables
Typical Programme Summary
Ready to start your project? Our team will confirm your programme and manufacturing slot within 24 hours of your enquiry.
Start Your Project →
ISO Frame Projects
Delivered Across the UK
The following projects demonstrate the breadth of ISO frame modular building applications across education, public sector, and commercial sectors. Each project was delivered within programme and to full Building Regulations compliance.
REI60 Modular Classroom Block — 4 Units Linked
A secondary school required four additional classrooms ahead of a September term start. Consequently, four ISO frame units were linked to form a single 212m² classroom block, fully insulated to REI60 standard with FD60 fire doors, addressable fire alarm, and DDA-compliant access throughout.
Project Highlights
Client Outcome
"Classrooms were ready two weeks before term started. The build quality exceeded our expectations and the installation team were professional throughout."
2-Storey Welfare & Office Unit — City Centre Site
A civil engineering contractor required a two-storey welfare and office solution for a city centre infrastructure project with restricted access. As a result, two ISO frame units were stacked using ISO corner castings, with an external staircase and HIAB installation completed within a single working day.
Project Highlights
Client Outcome
"The stacked unit solved our space problem on a very tight city centre plot. Hire-to-buy meant we kept cash in the business during the project."
Part L A-Rated Modular Office — 6 Units Linked
A logistics company needed a permanent, energy-efficient headquarters to replace ageing Portakabin offices. Accordingly, six ISO frame units were linked to create a 318m² open-plan office with meeting rooms, kitchen, and accessible WC facilities — all achieving EPC A-rating under Part L 2021.
Project Highlights
Client Outcome
"Our energy bills dropped by over 60% compared to the old Portakabin offices. The building looks and feels permanent — visitors can’t tell it’s modular."
Aggregated Project Results
Trusted by Clients Across
Have a similar project in mind? Our technical team will provide a specification recommendation and programme estimate within 24 hours.
Frequently Asked Questions
About ISO Frame Modular Buildings
Below are the most common questions we receive from clients considering ISO frame modular buildings. If your question is not answered here, our technical team is available to help.
An ISO frame modular building is a steel-framed structure built around standardised ISO corner castings — the same connection system used on shipping containers. This allows units to be stacked up to 3 floors, transported on standard low-loaders, and lifted by HIAB or mobile crane.
How ISO Frame Differs from Shipping Containers
Unlike converted shipping containers, ISO frame buildings are purpose-built with KINGSPAN insulated panels, full electrical and mechanical systems, and factory-finished interiors to Building Regulations standard. Consequently, they deliver superior thermal performance, acoustic insulation, and a professional interior finish suitable for offices, classrooms, and healthcare facilities.
Typical programmes run 8–12 weeks from order confirmation to practical completion. Manufacturing takes 4–10 weeks depending on specification and complexity. On-site installation takes just 1–5 days because 90% of the build is completed under factory conditions before dispatch.
Why Factory Build Eliminates Delays
Lead times are confirmed at order stage and are not affected by weather delays. Furthermore, all structural, electrical, and internal fit-out work is completed in a controlled factory environment under ISO 9001 quality management, ensuring consistent quality and programme certainty on every project.
KC Modular Buildings offers three specification levels: Standard (KINGSPAN insulated panels, PVC double glazing, panel heaters, from £18,000), REI60 Fire-Rated (60-minute fire-rated panels, FD60 doors, addressable fire alarm, from £28,000), and Part L A-Rated (triple-glazed aluminium windows, air-source heat pump, MVHR ventilation, EPC A-rating, from £38,000).
Choosing the Right Specification
All specifications are manufactured under ISO 9001, ISO 1090, and ISO 3834 certification. In addition, our technical team will recommend the most appropriate specification based on your site, sector, compliance obligations, and budget during the initial consultation.
Yes. ISO frame units can be stacked up to 3 floors using ISO corner castings, with each floor structurally independent. Units can also be linked side-by-side to create larger open-plan floor areas — for example, six linked units can deliver over 300m² of usable space.
Multi-Storey & Linked Configurations
External staircases, walkways, and lift shafts can be integrated into multi-storey configurations. Furthermore, linked units share a continuous roofline and internal corridor, creating a seamless building envelope that is indistinguishable from a traditionally constructed structure.
Yes. All ISO frame modular buildings from KC Modular Buildings are designed and manufactured to comply with Part L (energy efficiency), Part B (fire safety), Part M (accessibility), and Part F (ventilation) of the Building Regulations.
Compliance Documentation at Handover
REI60 and Part L A-Rated specifications include enhanced fire rating, FD60 doors, and addressable fire detection systems. Full compliance documentation — including as-built drawings, engineer sign-off, and Building Regulations certificates — is provided at handover on every project.
Yes. Every ISO frame unit is fully relocatable. Units can be disconnected, lifted by HIAB or crane, transported on a standard low-loader, and reinstalled at a new site without any loss of structural integrity or certification validity.
Retained Value & Warranty
All certifications and warranties remain valid regardless of how many times the building is relocated. As a result, ISO frame buildings retain their full residual value and compliance status throughout their service life — making them ideal for hire fleet, phased programmes, and temporary site requirements.
KC Modular Buildings provides a 10–15 year structural warranty on the steel frame, 5–10 years on KINGSPAN panels and roof, 5 years on windows and doors, and 12–24 months on internal workmanship and installation.
Extended Terms for Public Sector
Extended warranty terms are available for public sector and education contracts. Moreover, all warranties are backed by manufacturer certifications and independent QA inspection records completed at each stage of the factory build programme.
ISO frame modular buildings are used across education (classrooms, SEN units, sixth form centres), construction (site offices, welfare units), commercial (offices, showrooms, retail), healthcare (clinics, consulting rooms), residential (modular homes, annexes), and sports and leisure (pavilions, clubhouses, changing rooms).
UK-Wide Sector Coverage
KC Modular Buildings has delivered ISO frame projects across all of these sectors throughout England, Wales, and Scotland. In particular, education and public sector clients benefit from our framework buying options, extended warranties, and full compliance documentation packages.
Standard payment terms are 40% deposit at order confirmation, 55% prior to dispatch, and 5% retention within 14 days of practical completion. Flexible procurement options include hire, hire-to-buy, and lease/asset finance agreements through approved partners (typically 3–7 year terms).
Framework & Public Sector Procurement
Framework and call-off agreements are available for repeat clients and public sector buyers. Additionally, milestone payment schedules can be structured for larger multi-unit programmes to align with your project cash flow and procurement requirements.
ISO frame buildings from KC Modular Buildings achieve wall U-values of 0.16–0.25 W/m²K, roof U-values of 0.11–0.18 W/m²K, and floor U-values of 0.11–0.16 W/m²K depending on specification.
Part L A-Rated Performance
The Part L A-Rated specification includes triple-glazed aluminium windows (U-value 0.7 W/m²K), air-source heat pump (SCOP 4.5), and MVHR ventilation, achieving EPC A-rating and exceeding Part L 2021 requirements. Consequently, clients typically report energy cost reductions of 40–60% compared to older portable cabin or Portakabin-style buildings.
Still Have a Question?
Our technical team responds to all enquiries within 24 hours. Contact us directly by phone or email, or submit a project brief using the form below.
Ready to Specify Your
ISO Frame Modular Building?
Our technical team will review your site, compliance requirements, and programme — then recommend the most appropriate specification and provide a full itemised quotation within 24 hours.
Coverage
UK-Wide
England, Wales & Scotland
Lead Time
8–12 Weeks
From order to handover
Explore Related Products & Services
KC Modular Buildings
KC Cabins Solutions Ltd
Registered in England & Wales
UK-wide delivery & installation
© 2026 KC Cabins Solutions Ltd t/a KC Modular Buildings. All rights reserved. Registered in England & Wales.
