fbpx

Welfare Units

Modular welfare units for construction sites delivered across the UK by KC Modular Buildings ISO frame modular welfare system installed on a UK construction site Portable welfare construction cabin with drying room and toilet facilities Combo welfare unit with office space and canteen for construction site use
HSE & CDM 2015 Compliant

Welfare Units for
Construction Sites

Fully HSE-compliant welfare units designed, manufactured, and delivered across the UK. As a result, your site stays legally compliant from day one — without delays or compromise.

Furthermore, every unit includes toilets, drying rooms, canteens, and offices as standard. Buy from £12,500 or hire from £75/week. What’s more, we offer emergency delivery in just 48 hours.

✓ ISO 9001 Certified ✓ CDM 2015 Compliant ✓ 48hr Emergency Delivery ✓ Buy or Hire

Quick Specs

£12,500

Buy from (+ VAT)

£75/wk

Hire from

48hr

Emergency delivery

Stackable floors

4.9/5 from 47 verified reviews · 500+ projects delivered UK-wide

Hire vs Buy Guide

Under 6 months Hire
6–12 months Consider buying
Over 12 months Definitely buy
Legal Requirements

HSE Welfare Requirements Every Construction Site Must Meet

Under the Construction (Design and Management) Regulations 2015, every principal contractor is legally required to provide adequate welfare facilities before work begins. Furthermore, failure to comply can result in HSE enforcement action, site closure, and significant fines.

As a result, choosing the right welfare unit from the outset is not only a legal obligation — it is also essential for worker health, site productivity, and project reputation. All KC Modular welfare units are designed specifically to meet and exceed these requirements.

🚺

Toilet Provision

HSE regulations require 1 toilet per 7 workers for the first 25 workers on site. Furthermore, for every additional 25 workers, an additional toilet must be provided. In addition to this, separate facilities are required for male and female workers where reasonably practicable.

KC MODULAR STANDARD PROVISION

  • 2 WCs per standard 6m unit
  • 2 urinals per standard 6m unit
  • Scalable multi-unit configurations
🚰

Washing Facilities

All construction sites must provide hot and cold running water, soap, and drying facilities adjacent to every toilet. Moreover, where workers are exposed to hazardous substances, skin-cleansing agents and nail brushes must also be provided as a matter of legal requirement.

KC MODULAR STANDARD PROVISION

  • 2 wash basins with hot & cold water
  • Electric boiler for instant hot water
  • Soap dispenser & hand dryer included
💧

Drinking Water

Employers are legally required to provide an adequate supply of wholesome drinking water, clearly marked and readily accessible at all times. In addition to this, cups or other drinking vessels must be provided unless the supply is from a drinking fountain.

KC MODULAR STANDARD PROVISION

  • Clearly marked drinking water supply
  • Mains or tank-fed options available
  • Cups & dispensers included as standard
👔

Changing & Drying

Where workers are required to wear special clothing, suitable changing facilities must be provided. Furthermore, where clothing may become wet during work, a heated drying room is required so that workers can dry clothing before leaving site. This is particularly important on UK outdoor construction sites.

KC MODULAR STANDARD PROVISION

  • Heated drying room with rail & hooks
  • Secure personal lockers included
  • Bench seating for changing

Rest & Canteen Facilities

Suitable rest facilities must be provided, including seating with backs, tables, and a means of heating food and water. In addition to this, where workers regularly eat on site, a canteen or mess room is required. Consequently, workers must not be required to eat in areas where they may be exposed to contamination.

KC MODULAR STANDARD PROVISION

  • Heated rest area with seating & tables
  • Microwave & kettle facilities
  • Full canteen upgrade available
💡

Heating & Lighting

All welfare facilities must be adequately heated and lit at all times during working hours. Furthermore, the Workplace (Health, Safety and Welfare) Regulations 1992 require that temperatures in indoor workplaces reach a minimum of 16°C — or 13°C where the work involves physical effort. As a result, all KC Modular welfare units include heating and LED lighting as standard.

KC MODULAR STANDARD PROVISION

  • Electric panel heaters throughout
  • IP65 LED lighting in all rooms
  • Emergency lighting available as option

Full CDM 2015 Compliance Checklist

Every KC Modular Welfare Unit Meets All Six HSE Requirements

Not only do our welfare units satisfy the minimum legal requirements, but they also exceed them in terms of insulation, energy efficiency, and build quality. Consequently, your site remains compliant, your workers remain comfortable, and your project stays on schedule.

Toilet provision
CDM Reg. 30

Washing facilities
CDM Reg. 30

Drinking water
CDM Reg. 31

Changing & drying
CDM Reg. 32

Rest & canteen
CDM Reg. 33

Heating & lighting
WHS Reg. 1992

For further information on welfare requirements, visit the official HSE Construction Welfare Guidance or the UK Building Regulations Technical Guidance. In addition to this, our team is available to advise on site-specific compliance requirements — call 01782 561 110 for expert guidance.

Product Range

Welfare Units for Every Site Requirement

Whether you need a compact standalone unit or a multi-storey welfare complex, we manufacture a complete range of HSE-compliant welfare units. Furthermore, every unit is available to buy or hire — so you can choose the most cost-effective option for your project duration.

Standard welfare unit 6m x 2.4m — portable HSE-compliant welfare cabin for UK construction sites
Best Seller Buy or Hire

Standard Welfare Unit

6m × 2.4m · Single Module

Our most popular welfare unit, specifically designed for small to medium construction sites. As a result of its compact footprint, this unit fits easily into tight site layouts. Furthermore, it includes all six HSE welfare requirements as standard — toilets, washing, drinking water, drying room, changing, and rest area.

Included Facilities

2 WCs 2 Urinals 2 Wash basins Drying room Lockers LED lighting Heating Hot water boiler

Buy from

£12,500 + VAT

Hire from

£75/week

Get a Quote →
Welfare and office combo unit 12m x 3m — combined site office and welfare facilities by KC Modular Buildings
Most Versatile Buy or Hire

Welfare + Office Combo

12m × 3m · Dual-Function Module

This dual-function unit combines full welfare facilities with a dedicated site office and meeting space. Consequently, you save valuable site footprint by consolidating two functions into a single module. In addition to this, the office section includes data cabling, power sockets, and LED lighting for a professional working environment.

Included Facilities

Full welfare suite Site office Meeting space Data cabling Drying room Lockers Heating Power sockets

Buy from

£24,000 + VAT

Hire from

£140/week

Get a Quote →
Welfare canteen unit with mess room seating and kitchen facilities for construction site workers
Full Canteen Buy or Hire

Welfare + Canteen Unit

12m × 3m · Full Mess Facilities

Specifically designed for larger construction sites where workers regularly eat on site. As a result of the dedicated canteen section, this unit exceeds CDM Regulation 33 requirements. Furthermore, the kitchen area includes a full-size microwave, kettle, fridge, and stainless steel worktop — ensuring workers have access to proper meal preparation and rest facilities throughout the working day.

Included Facilities

Full welfare suite Canteen seating Kitchen worktop Microwave & kettle Fridge Drying room Lockers Hot water boiler

Buy from

£26,500 + VAT

Hire from

£155/week

Get a Quote →
Multi-storey stackable welfare units — two-storey configuration on UK construction site by KC Modular Buildings
Large Sites Buy or Hire

Multi-Storey Stackable

Up to 3 Floors · ISO Frame System

Specifically engineered for major construction projects and confined urban sites where ground-level space is limited. As a result of the ISO frame stackable design, you can accommodate welfare, offices, canteen, and drying facilities across up to three floors. Furthermore, each module is crane-lifted into position and interconnected on site — reducing installation time to as little as one day per floor.

Included Facilities

Full welfare per floor External staircase Canteen option Office option Drying rooms Fire-rated walls Emergency lighting Crane-lift install

Buy from

£34,000 + VAT

Hire from

£195/week

Get a Quote →

Not Sure Which Unit?

We Help You Choose the Right Welfare Unit for Your Site

Every construction site is different. As a result, our team will assess your workforce size, site layout, project duration, and compliance requirements — then recommend the most cost-effective solution. Furthermore, all units can be customised to your exact specification.

Get a Free Site Assessment → ☎ 01782 561 110

Free quotes within 24 hours · No obligation

All welfare units are manufactured in our UK factory and delivered nationwide. Standard lead time: 2–4 weeks for stock units, 4–8 weeks for bespoke configurations. Prices shown are guide prices — final pricing depends on specification, delivery location, and site requirements. View full product range →

Technical Specifications

Welfare Unit Technical Specifications & Build Standards

Every KC Modular welfare unit is manufactured to exacting standards in our UK factory. Furthermore, all units are built using KINGSPAN QuadCore insulated panels, certified steel frames, and UK-standard electrical and plumbing systems — ensuring long-term durability, energy efficiency, and full regulatory compliance.

Structure & Envelope

Frame, panels, roof & floor

Frame Hot-dip galvanised steel, ISO 1090 & ISO 3834 certified
Wall Panels KINGSPAN QuadCore 100mm, U-value 0.22 W/m²K
Roof Panels KINGSPAN QuadCore 170mm, U-value 0.11 W/m²K
Floor Insulation PIR Thermano Deck 160mm, U-value 0.13 W/m²K
Floor Finish SPC rigid core click vinyl, anti-slip, wipe-clean
Roof Membrane PVC PROTAN, fully bonded, 20-year warranty
Anti-Corrosion PN EN ISO 8501 surface prep, epoxy primer coat

Windows, Doors & Access

Openings, glazing & security

Windows Aluminium double-glazed, U-value 1.4 W/m²K
Glazing 4–16–4mm argon-filled, low-e coating
External Door Aluminium, U-value 1.1 W/m²K, multi-point lock
Internal Doors FD30 fire-rated, solid core, self-closing
DDA Access Level threshold, grab rails, accessible WC option
Security Anti-jemmy hinges, deadlock, hasp & staple
Ventilation Trickle vents + mechanical extract in WC & shower

Electrical Systems

Power, lighting & safety

Supply UK 230V single phase, 63A incoming supply
Consumer Unit RCD-protected, MCB per circuit, 17th Edition wiring
Lighting IP65 LED panels, 300 lux minimum throughout
Emergency Lighting 3-hour maintained, BS 5266-1 compliant
Sockets 13A double sockets throughout, IP44 in wet areas
Heating Electric panel heaters, thermostat-controlled per room
Fire Alarm Interlinked smoke detectors, BS 5839-6 Grade D

Plumbing & Sanitary

Water, drainage & sanitary fittings

Water Supply Mains or tank-fed, 22mm copper pipework
Hot Water 80L electric boiler, thermostat-controlled, 60°C
Sanitary System GEBERIT concealed cisterns, 25-year warranty
WC Pan Vitreous china, dual-flush 4/6L, wall-hung option
Wash Basins Stainless steel or ceramic, sensor taps available
Wall Finish FIBO hygienic wall panels, anti-mould, wipe-clean
Drainage 110mm UPVC soil stack, mains connection or holding tank
Frost Protection Lagged pipework, trace heating on exposed runs

Dimensions & Configurations

Sizes, weights & stacking

Standard Unit 6.0m × 2.4m × 2.8m (L×W×H)
Combo Unit 12.0m × 3.0m × 2.8m (L×W×H)
Internal Height 2.4m clear internal ceiling height
Unit Weight 3,200kg (6m unit), 6,800kg (12m unit)
Stacking Up to 3 floors, ISO corner castings, crane-lift
Transport Standard flatbed or HIAB, no special permit required
Foundation Concrete pads, adjustable steel feet or ground beams
Relocatable Fully relocatable, no structural modifications required

Certifications & Compliance

Standards, accreditations & warranties

Quality ISO 9001 Quality Management certified
Steel & Welding ISO 1090 & ISO 3834 structural steel certified
Environmental ISO 14001 Environmental Management certified
H&S Accreditation Constructionline Bronze, SSIP, Acclaim certified
Building Regs Part L 2021, Part B, Part F, Part M compliant
Structural Warranty 10–15 years steel frame structural warranty
Panel Warranty 5–10 years KINGSPAN panels & roof membrane
Workmanship 12–24 months installation workmanship warranty

Need Full Technical Documentation?

Download Our Welfare Unit Technical Data Sheets

Our full technical data sheets include detailed drawings, CAD files, U-value calculations, electrical schematics, and compliance certificates. Furthermore, our technical team can provide bespoke specification documents for tender submissions and building control applications.

Request Technical Data Sheet → ☎ Speak to Our Technical Team

CAD drawings · U-value calculations · Compliance certificates

All specifications are subject to change without notice. Final specifications are confirmed at order stage. For full compliance documentation, visit the UK Building Regulations Technical Guidance or contact our technical team on 01782 561 110.

Flexible Procurement

Buy, Hire, or Hire-to-Buy — Choose the Best Option for Your Project

Not every project has the same budget or timeline. As a result, we offer three flexible procurement routes for every welfare unit in our range. Furthermore, our team will help you calculate the most cost-effective option based on your project duration, workforce size, and capital expenditure requirements.

🏠

Buy Outright

Capital purchase · Full ownership

Standard 6m unit from

£12,500 + VAT

  • Full ownership from day one
  • No ongoing rental payments
  • Relocate between sites at will
  • Strong residual resale value
  • Capital allowance tax benefits
  • 10–15 year structural warranty

✅ Best for: Projects over 12 months, multi-site contractors, fleet operators

Payment Terms

40% deposit · 55% before delivery · 5% within 14 days

Get a Purchase Quote →
⭐ Most Popular Option
📅

Hire / Rental

Weekly rental · Flexible terms

Standard 6m unit from

£75/week + VAT

  • Zero capital outlay required
  • Minimum 12-week hire period
  • Delivery & collection included
  • Scale up or down as needed
  • 100% tax-deductible as OPEX
  • Upgrade to hire-to-buy anytime

⭐ Best for: Short-term projects, cash flow management, first-time site setup

Payment Terms

Monthly invoicing · 30-day payment terms · No deposit on approved credit

Get a Hire Quote →
🔄

Hire-to-Buy

Rental credited towards purchase

Rental payments offset against

100% purchase price

  • Start hiring, decide to buy later
  • 100% of hire payments credited
  • No penalty for early conversion
  • Try before you commit to purchase
  • Ideal for growing contractor fleets
  • Full warranty transfers on purchase

✅ Best for: Growing businesses, uncertain project pipelines, asset-building contractors

Payment Terms

Weekly hire payments · Convert to purchase at any point · All payments credited

Get a Hire-to-Buy Quote →

Side-by-Side Comparison

Buy vs. Hire vs. Hire-to-Buy — key differences at a glance

Feature Buy Outright Hire / Rental Hire-to-Buy
Upfront Cost High (40% deposit) None / Low None / Low
Ownership Immediate No ownership On conversion
Monthly Cost None after purchase £300–£780/month £300–£780/month
Tax Treatment Capital allowance 100% OPEX deduction OPEX then CAPEX
Flexibility Relocate freely Return anytime Convert anytime
Minimum Term None 12 weeks 12 weeks
Warranty 10–15 years Covered by KC Transfers on purchase
Best For 12+ month projects Short-term sites Growing fleets

Asset Finance Available

Spread the Cost Over 3–7 Years with Asset Finance

In addition to our buy and hire options, we work with specialist asset finance partners to offer lease and hire-purchase agreements over 3–7 years. As a result, you can acquire a full welfare unit fleet with manageable monthly payments — preserving your working capital for core business operations. Furthermore, all finance is arranged through FCA-authorised partners.

Finance lease Hire purchase Operating lease 3–7 year terms FCA-authorised partners
Discuss Finance Options → ☎ 01782 561 110

Subject to status · FCA-authorised partners · No consumer credit

Sector Applications

Welfare Units Designed for Every Industry

From major infrastructure projects to remote rural sites, our welfare units serve contractors and organisations across every sector. Furthermore, each unit can be configured to meet the specific compliance, capacity, and operational requirements of your industry — ensuring full HSE compliance from day one.

🏗

Construction & Civil Engineering

Our largest sector · 60% of welfare unit orders

Construction sites have the most demanding welfare requirements under CDM 2015 Regulations 30–33. As a result, our units are specifically designed to withstand the rigours of active building sites — including heavy foot traffic, muddy boots, and continuous daily use. Furthermore, all units are delivered fully compliant and ready for HSE inspection from the moment they arrive on site.

House building Commercial fit-out Demolition Groundworks Refurbishment

Key Requirements Met

CDM 2015 compliant Anti-vandal security Heavy-duty flooring Drying room

Infrastructure & Utilities

Roads, rail, energy & water projects

Infrastructure projects often operate in remote locations with limited access to mains services. Consequently, our welfare units are available with self-contained water tanks and waste holding tanks — enabling full welfare compliance even on sites without mains connections. In addition to this, all units are designed for rapid deployment and relocation as work progresses along linear routes.

Highways Rail Energy Water & sewage Telecoms

Key Requirements Met

Self-contained tanks Rapid relocation Generator compatible Frost protection
🏫

Education & Public Sector

Schools, councils & government projects

School expansion and public sector refurbishment projects require welfare facilities that operate safely alongside occupied buildings. As a result, our units for this sector include enhanced fire safety, DDA-compliant access, and low-noise electrical systems. Furthermore, we are Constructionline Bronze members — pre-qualified for public sector procurement frameworks.

Schools Hospitals Council buildings MOD sites Heritage

Key Requirements Met

DDA accessible FD30 fire doors Constructionline Low-noise systems
🎪

Events & Temporary Sites

Festivals, sporting events & pop-up sites

Temporary events and pop-up sites require welfare facilities that can be deployed and removed rapidly without groundworks. As a result, our hire fleet is specifically suited to short-term event use — with self-contained water and waste tanks eliminating the need for mains connections. Furthermore, units can be on site within 48–72 hours of order confirmation, making them ideal for time-critical event setups.

Music festivals Sporting events Film & TV sets Agricultural shows Pop-up retail

Key Requirements Met

48–72hr deployment No groundworks needed Self-contained tanks Rapid collection
🏭

Industrial & Manufacturing

Factories, warehouses & plant sites

Industrial and manufacturing environments demand welfare facilities that can withstand chemical exposure, heavy soiling, and continuous shift-pattern use. As a result, our industrial welfare units feature chemical-resistant FIBO wall panels, stainless steel sanitary fittings, and reinforced anti-slip flooring. Furthermore, units can be positioned directly adjacent to production areas — minimising worker travel time and maximising productivity.

Factories Warehouses Plant hire yards Quarries Recycling depots

Key Requirements Met

Chemical-resistant walls Stainless steel fittings Anti-slip flooring Shift-pattern use
🌿

Agriculture & Rural Sites

Farms, forestry & remote locations

Agricultural and rural worksites frequently lack mains water, drainage, and power connections. Consequently, our rural welfare units are supplied with 1,000-litre fresh water tanks, 1,500-litre waste holding tanks, and solar panel or generator power options. Furthermore, all pipework is fully lagged and trace-heated to prevent freezing during UK winter operations — ensuring year-round welfare compliance regardless of location.

Farms Forestry Wind farms Remote utilities Flood defence

Key Requirements Met

1,000L water tank 1,500L waste tank Solar/generator power Frost-protected pipes

6+

Sectors served

UK-wide

Delivery & installation

48hrs

Emergency hire deployment

100%

HSE compliant on delivery

Your Sector Not Listed?

We Supply Welfare Units to Any Industry Across the UK

If your sector or application is not listed above, contact our team directly. As a result of our bespoke manufacturing capability, we can configure a welfare unit to meet virtually any operational or compliance requirement.

Discuss Your Requirements → ☎ 01782 561 110

UK-wide delivery · 2–4 week lead time · Free site assessment

All welfare units comply with the HSE Construction Welfare Guidance, UK Building Regulations, and CDM 2015 Regulations 30–33. For sector-specific compliance advice, call our team on 01782 561 110.

Delivery & Installation

From Order to Operational — How We Deliver Your Welfare Unit

Every KC Modular welfare unit is manufactured in our UK factory and delivered directly to your site. Furthermore, our turnkey delivery and installation service means your unit arrives fully tested, HSE-compliant, and ready for immediate use — with no additional trades or fit-out required on site.

1

Enquiry & Site Assessment

Day 1–2

Contact our team with your project requirements. As a result, we assess your workforce size, site layout, access constraints, and service connections — then recommend the most suitable welfare unit configuration.

Free site assessment No-obligation quote 24hr response time
2

Specification & Order

Day 2–5

We confirm the final specification, layout, and pricing. Furthermore, you receive detailed technical drawings and a formal quotation. Once approved, your order enters our production schedule immediately.

Technical drawings Fixed-price quotation Flexible payment terms
3

Factory Manufacture

Week 2–4 (stock) · Week 4–8 (bespoke)

Your welfare unit is manufactured in our controlled factory environment. As a result, 90% of the build is completed off-site — eliminating weather delays and ensuring consistent quality. Furthermore, every unit undergoes a full factory inspection and test before dispatch.

90% factory completion Full QA inspection Photo updates provided
4

Delivery & Positioning

Scheduled to your programme

Your unit is delivered on a standard flatbed or HIAB vehicle and positioned precisely on your prepared base. Furthermore, no special permits are required for standard units — and our logistics team coordinates delivery timing to suit your site programme.

Flatbed or HIAB delivery No special permits Precise positioning
5

Service Connections & Commissioning

Same day as delivery

Once positioned, our installation team connects the unit to your site’s electrical supply, water mains, and drainage. Alternatively, for remote sites without mains services, we commission the self-contained water and waste tank systems. Furthermore, all electrical connections are tested and certified before handover — ensuring full compliance from the moment your workforce enters the unit.

Mains Connection

Electric, water & drainage

Off-Grid Option

Tank & generator setup

Electrical Testing

EICR certificate issued

Plumbing Testing

Pressure test & sign-off
6

Handover & Compliance Documentation

Same day as installation

Following successful commissioning, we carry out a full handover walkthrough with your site manager. As a result, you receive a complete compliance documentation pack — including the EICR electrical certificate, pressure test certificate, O&M manual, and warranty documentation. Furthermore, our team remains available for ongoing technical support throughout your hire or ownership period.

EICR Certificate

Electrical compliance cert

O&M Manual

Full operations manual

Warranty Pack

All warranties registered

Aftercare Support

Direct technical contact

Delivery Lead Times at a Glance

Standard and bespoke welfare unit lead times — UK-wide delivery

Unit Type Stock Unit Bespoke Unit Emergency Hire
Standard Welfare Unit (6m) 2–4 weeks 4–6 weeks 48–72 hrs
Welfare + Office Combo (12m) 3–5 weeks 5–8 weeks Subject to availability
Welfare + Canteen (12m) 3–5 weeks 5–8 weeks Subject to availability
Multi-Storey Stackable (2–3 floors) 4–6 weeks 6–10 weeks Not available
Off-Grid / Self-Contained 3–5 weeks 5–8 weeks 72–96 hrs

UK-Wide Delivery Coverage

We Deliver Welfare Units to Every Corner of the UK

Our logistics network covers England, Wales, and Scotland as standard. Furthermore, delivery to Northern Ireland, UK islands, and selective mainland Europe is available by quotation for larger orders. As a result, regardless of your project location, our team can get a welfare unit to your site.

England & Wales

Standard delivery included

Scotland

Standard delivery included

Northern Ireland

Available by quotation

Europe

Large projects by quotation

Check Delivery to Your Site → ☎ 01782 561 110

Emergency hire available · 48–72hr deployment · UK-wide

Lead times shown are indicative and subject to current production schedules. Emergency hire is subject to stock availability. Delivery charges are calculated based on distance from our UK factory. For urgent requirements, call our logistics team directly on 01782 561 110 or email [email protected].

Frequently Asked Questions

Welfare Unit FAQs — Everything You Need to Know

Below you will find answers to the most common questions we receive about our welfare units. Furthermore, if your question is not answered here, our technical team is available on 01782 561 110 — Monday to Friday, 8am–5pm.

How many welfare units do I need for my construction site?

Under CDM 2015 Regulation 30, you must provide 1 toilet per 7 workers for the first 25 workers on site. As a result, a standard 6m welfare unit — which includes 2 WCs and 2 urinals — is suitable for sites with up to 14 workers. Furthermore, for larger sites, we recommend a 12m combo unit or multiple standard units. Our team will calculate the exact provision required for your workforce size at no charge.

Do welfare units need planning permission?

In most cases, temporary welfare units do not require planning permission when used in connection with an active construction project. As a result, units can typically be installed immediately without delay. However, in sensitive locations such as Green Belt, AONB, or conservation areas, permitted development rights may be restricted. Consequently, we recommend checking with your local planning authority for projects in these areas. Furthermore, our team can advise on site-specific planning considerations.

What is the difference between a welfare unit and a portable cabin?

A welfare unit is specifically designed and equipped to meet all six HSE welfare requirements under CDM 2015 — including toilets, washing facilities, drinking water, changing, drying, and rest areas. In contrast, a portable cabin is a general-purpose modular building that may be used as an office, store, or canteen without the full welfare fit-out. As a result, only a dedicated welfare unit will satisfy an HSE welfare inspection on a construction site. Furthermore, all KC Modular welfare units are supplied with a compliance documentation pack as standard.

Can welfare units be used without mains water or drainage?

Yes. Our self-contained welfare units are fitted with a 1,000-litre fresh water tank and a 1,500-litre waste holding tank — eliminating the need for mains connections. As a result, they are suitable for remote construction sites, agricultural locations, rural infrastructure projects, and temporary event sites. Furthermore, the waste tank is emptied by a standard tanker service, which we can arrange on your behalf. In addition to this, solar panel and generator power options are available for fully off-grid operation.

How quickly can a welfare unit be delivered to site?

Standard stock welfare units are typically delivered within 2–4 weeks of order confirmation. Furthermore, for urgent requirements, our emergency hire fleet can be deployed to site within 48–72 hours — subject to stock availability and site access. Bespoke welfare units with custom layouts or specifications have a lead time of 4–8 weeks depending on complexity. As a result, we recommend contacting our team as early as possible in your project programme to secure your preferred delivery slot.

What foundations do welfare units require?

Our standard welfare units can be positioned on concrete pads, adjustable steel feet, or ground beams — depending on your site conditions and ground bearing capacity. As a result, no specialist groundworks contractor is required in most cases. Furthermore, for multi-storey stackable configurations, we provide a detailed foundation specification as part of the technical documentation pack. In addition to this, our installation team will assess ground conditions on arrival and advise on the most suitable foundation method.

Are KC Modular welfare units HSE compliant?

Yes. Every KC Modular welfare unit is designed, manufactured, and equipped to fully comply with CDM 2015 Regulations 30–33 and the Workplace (Health, Safety and Welfare) Regulations 1992. Furthermore, all units are supplied with an EICR electrical certificate, pressure test certificate, and full compliance documentation pack. As a result, your unit is ready for HSE inspection from the moment it arrives on site. In addition to this, we hold Constructionline Bronze, SSIP, and Acclaim accreditations.

Is it cheaper to buy or hire a welfare unit?

The most cost-effective option depends on your project duration. As a general rule, hiring is more cost-effective for projects under 12 months, whilst buying outright delivers better value for longer projects or contractors who need welfare facilities across multiple sites. Furthermore, our hire-to-buy option allows you to start hiring and convert to a purchase at any point — with 100% of hire payments credited against the purchase price. Consequently, you are never locked into a decision. Our team can provide a detailed cost comparison for your specific project at no charge.

Can welfare units be stacked or used on multiple floors?

Yes. Our ISO frame welfare units are engineered to be stacked up to 3 floors high using ISO corner castings and crane-lift installation. As a result, multi-storey welfare complexes can be created on sites with limited ground-level footprint — such as urban construction projects or confined industrial sites. Furthermore, each floor is interconnected via an external staircase, and fire-rated walls and emergency lighting are included as standard on all multi-storey configurations.

What warranty comes with a KC Modular welfare unit?

All purchased welfare units include a 10–15 year structural warranty on the steel frame, a 5–10 year warranty on KINGSPAN panels and the roof membrane, a 5-year warranty on windows and doors, and a 12–24 month workmanship warranty on installation and internal fit-out. Furthermore, GEBERIT sanitary systems carry their own 25-year manufacturer’s warranty. As a result, KC Modular welfare units offer significantly longer warranty coverage than most competitor products. In addition to this, extended warranties are available for public sector and framework clients.

Can welfare units be customised or branded?

Yes. All KC Modular welfare units can be fully customised to your specification — including bespoke internal layouts, company colour schemes, external cladding finishes, and branded signage. Furthermore, we can incorporate additional features such as shower facilities, accessible WCs, canteen extensions, office sections, CCTV, and data cabling. As a result, your welfare unit can serve as a professional, branded site facility that reflects your company’s standards. Contact our team to discuss your bespoke requirements.

Do you deliver welfare units across the whole of the UK?

Yes. We deliver welfare units to England, Wales, and Scotland as standard, with delivery to Northern Ireland and selective mainland Europe available by quotation for larger orders. Furthermore, our logistics team coordinates delivery timing to suit your site programme — including early morning, weekend, and phased deliveries where required. As a result, regardless of your project location, our team will find a delivery solution that works for your programme. Call 01782 561 110 to confirm delivery to your specific location.

Still Have Questions?

Speak Directly to Our Welfare Unit Specialists

Our technical team has over 15 years of experience supplying HSE-compliant welfare units to construction sites, infrastructure projects, and public sector organisations across the UK. As a result, we can answer any question — from CDM compliance to bespoke specification — quickly and accurately. Furthermore, all advice is free and without obligation.

CDM compliance Sizing & capacity Buy vs. hire Bespoke spec Delivery & install Finance options
Send Us Your Question → ☎ 01782 561 110

Mon–Fri 8am–5pm · Free advice · No obligation

For further guidance on welfare requirements, visit the HSE Construction Welfare Guidance, the UK Building Regulations Technical Guidance, or contact our team on 01782 561 110.

Get Started Today

Request Your Free Welfare Unit Quote

Whether you need a single welfare unit for a short-term project or a multi-unit welfare complex for a major infrastructure programme, our team will provide a detailed, no-obligation quotation within 24 hours. Furthermore, every quote includes delivery, installation, and compliance documentation — so you know the full cost from the start.

Call Our Team

Speak directly to a welfare unit specialist. As a result, you will receive expert advice on sizing, specification, compliance, and pricing — tailored to your project.

01782 561 110

Mon–Fri 8am–5pm

Email Your Requirements

Send us your project details — including workforce size, site location, and programme dates. Furthermore, we will respond with a full quotation within 24 hours.

Send Email →

24-hour response guaranteed

📋

Online Quote Form

Complete our quick online form with your project details. As a result, our team will prepare a detailed quotation including delivery, installation, and all compliance documentation.

Get Free Quote →

No obligation · Free advice

ISO 9001

Quality Management

ISO 14001

Environmental

EN 1090

Steel Fabrication

SSIP

Health & Safety

CDM 2015

Full Compliance

90% Factory Complete

Minimal on-site disruption. As a result, your welfare unit is operational within hours of delivery.

📅

2–4 Week Delivery

Standard stock units delivered within weeks. Furthermore, emergency hire available in 48–72 hours.

💰

Buy, Hire, or Hire-to-Buy

Flexible procurement to match your budget. Consequently, 100% of hire payments credited on purchase.

🛡

15-Year Structural Warranty

Industry-leading warranty coverage. Furthermore, GEBERIT sanitary systems include a 25-year guarantee.

KC Modular Buildings is one of the UK’s leading manufacturers of HSE-compliant welfare units for construction, infrastructure, and public sector projects. Furthermore, every unit is designed, built, and tested in our UK factory to meet CDM 2015, Building Regulations Part L 2021, and Workplace (Health, Safety and Welfare) Regulations 1992. As a result, when you choose KC Modular, you are choosing compliance, quality, and peace of mind — delivered on time and within budget.

Home · Modular Buildings · ISO Frame · Bespoke · Contact · Shop