fbpx

Case Studies

Projects Real UK Case Studies

Case Studies

Real modular projects across the UK — from education and commercial spaces to councils and welfare. Therefore, you can see typical layouts, delivery approaches and specification paths before you request a quote.

✓ Education, Commercial, Councils
✓ ISO Frame & Bespoke Modular
✓ UK-wide delivery planning
✓ Typical quote response within 48h
Education modular classroom case study concept in Cardiff, Caerdydd, Wales, UK
Description: Classroom block case study — phased install on a live school site — Cardiff (Caerdydd), Wales.
Caption: Education case study — modular classrooms (Cardiff / Caerdydd).
Slide 1 of 4

Browse by sector

Use these quick links to jump to case studies by sector. Then request a similar quote pack for your site.

Case study library

These are example scenarios and typical outcomes. However, every site differs, so the quote pack confirms the final scope. Typical quote response within 48h.

Modular classrooms case study example in Cardiff, Caerdydd, Wales, UK
Education

Modular Classroom Block

Use-case: classrooms + staff support. Location example: Cardiff / Caerdydd, Wales.

Description: phased delivery to reduce disruption on a live site.

Commercial modular offices case study example in Manchester, Greater Manchester, UK
Commercial

Office Pavilion / HQ Annex

Use-case: reception + meeting rooms. Location example: Manchester, Greater Manchester.

Description: professional finish with predictable programme.

Construction welfare unit case study example in Birmingham, West Midlands, UK
Construction

Welfare Block

Use-case: welfare, canteen, drying. Location example: Birmingham, West Midlands.

Description: durable finishes and quick deployment.

Councils and public sector modular building case study example in Edinburgh, Dùn Èideann, Scotland, UK
Councils & Public

Public-facing Service Building

Use-case: reception + meeting rooms. Location example: Edinburgh / Dùn Èideann, Scotland.

Description: clear assumptions for approvals and delivery planning.

What to look for in a case study

These are the decision points that usually matter most. Therefore, we structure case studies around the real project journey.

System choice

ISO Frame for speed, Bespoke for premium finish. We explain why the system was selected.

Layout logic

Room schedule, circulation, accessibility and how the space supports day-to-day use.

Site constraints

Access, lifting, groundworks and utilities — the things that determine programme certainty.

Want a similar outcome on your site?

Send your brief and postcode — we’ll recommend the right system and outline a quote pack. Typical quote response within 48h (Mon–Fri).

How these projects typically run

01

Brief + site constraints

Use case, room schedule, postcode, access and any compliance pathway (fire/energy).

02

System + specification path

ISO Frame vs Bespoke, then confirm option path (e.g., REI / Part L where required).

03

Delivery + installation plan

Access, lifting, groundworks and utilities planned so delivery is predictable.

Case studies — FAQ

Short answers designed for search snippets and fast buyer decisions.

Are these real finished projects?
This library shows real project patterns and common outcomes. However, each site differs, so final scope is confirmed in the quote pack.
How fast can you return a quote?
Typical quote response is within 48 hours (Mon–Fri) once we have use case, size/layout and postcode.
Can you deliver in phases on live sites?
Often yes. Therefore, we plan access, working hours and delivery sequencing early to minimise disruption.

Send your brief — we’ll match you to the right system

Tell us the use case, size and postcode. Therefore, we can recommend ISO Frame vs Bespoke and provide a quote pack. Typical quote response within 48h.