Constructing Modular Building in Few Steps
Starting from the process of decision making through manufacturing and finally constructing the building, here’s a quick overview of the construction process of a modular building which comes alive in few quick and simple steps.
1. After discussing your needs for a modular structure with our team, it is agreed what will be the chosen design of the building. Decisions are being made in regards to chosen color, shape and size as well as any additional requirements of the space, such as toilet, kitchenette, canopy and more. Ready designs may be chosen from our website and discussed with each client on a case to case basis. A client can also present us with his idea of the space by producing a quick handmade sketch and we will advise on what we can offer. To make sure the chosen building is designed to match your needs it is crucial that we are informed of all the requirements during this process.
2. All individual modules are then manufactured under factory conditions. Once modules are pre-engineered, the building is ready to be transported.
3. Modules are then transported from the factory site to the building site by a lorry.
4. Once delivered modules can be put in place. Decisions on how modules are put together are dependent on the required size of the structure. Modules are positioned either end to end (creating longer structures) or side by side (creating wider structures). It gives many possible options to our clients. A modular building may be constructed from as little as one module (which will mean it will be relatively small) and up to as many modules as needed (creating larger structure).
5. Modules are placed in position with the use of a mobile crane or hi-ab. The construction period is much shorter than in case of traditional structures. Once crane positioned individual modules in place our crew will make sure all the modules are joined together in a safe way. The building crew will also finish off by fulfilling any additional requests form our client.
6. Examples of additional jobs could be installing a toilet, kitchenette, canopy or floor panels. Those jobs are done on site. After that, the building is ready to be taken over by our client.
Write a Comment