fbpx

ISO Frame Modular Buildings

ISO Frame Modular System

ISO Frame System UK
Factory-Built Modular Units

High-performance steel-frame modular units designed for rapid deployment across the UK. Stackable to 3 storeys, ISO 9001 certified, and available in standard, REI60 fire-rated and Part L 2021 A-rated versions. From £12,900 — buy or hire.

From £12,900

Buy price + VAT

4–8 Weeks

Lead time

3 Storeys

Stackable

90%

Factory-built

ISO 9001

Certified

UK-Wide

Delivery & install

What is the ISO Frame System?

High-Performance Modular Units,
Built for the UK Market

The KC ISO Frame System is a factory-built steel modular platform designed for rapid deployment, repeatable installation and long-term durability. Because each unit is precision-engineered off-site and delivered ready to use, you benefit from faster build times, lower site costs and guaranteed quality — regardless of weather or ground conditions.

Furthermore, ISO Frame units are fully stackable to three storeys and available in three performance tiers — Standard, REI60 fire-rated and Part L 2021 A-rated — making them suitable for offices, welfare facilities, classrooms, security cabins and multi-storey commercial buildings across the UK.

ISO Frame modular building system UK by KC Modular Buildings

Unlike traditional construction, the ISO Frame System is manufactured entirely in our controlled factory environment. As a result, each unit arrives on site with 90% of the build already complete — including insulation, electrics, flooring and internal finishes. Installation consequently takes just 1–3 days, even for multi-module configurations.

  • Steel Frame Construction

    High-strength closed steel profiles with anti-corrosive coating. Compliant with ISO 1090 and ISO 3834 welding standards.

  • Stackable to 3 Storeys

    Bolted modular construction allows vertical stacking without additional structural works, significantly reducing cost per m² for multi-storey projects.

  • Three Performance Tiers

    Standard, REI60 fire-rated and Part L 2021 A-rated versions available. All tiers share the same steel frame platform, so upgrades are straightforward.

  • Fully Relocatable

    Because ISO Frame units are bolted rather than welded on site, they can be dismantled, relocated and reinstalled at a new location — protecting your capital investment long-term.

  • Buy or Hire Available

    ISO Frame units are available to purchase outright or hire on a weekly basis, with hire-to-buy options also available for longer-term requirements.

70% Faster Than Traditional Build

Because 90% of the build is completed in our factory, on-site installation takes just 1–3 days. As a result, your building is operational weeks sooner than a traditional construction programme.

🔥

REI60 Fire Rating Available

Our REI60 tier provides 60-minute structural fire resistance, which means it meets the requirements for education, healthcare and public sector applications where enhanced fire safety is mandatory.

🌿

Part L 2021 A-Rated Energy

Our A-rated tier is fully compliant with Part L 2021 Building Regulations. Furthermore, mineral wool insulation up to 240mm and triple-glazed windows deliver outstanding thermal performance and low running costs.

🏆

7 ISO Certifications

Every ISO Frame unit is manufactured under ISO 9001, 1090, 3834, 14001, 27001, 22301 and 8501 certified systems, ensuring full traceability, structural integrity and suitability for government and public sector procurement.

Explore the full ISO Frame range below, or jump directly to a section:

Product Range

ISO Frame Models, Sizes & Pricing

Our ISO Frame range covers everything from single-person site offices to multi-storey commercial buildings. Because every model shares the same certified steel frame platform, you can mix and match units, stack them vertically, or link them side by side. Furthermore, all models are available to buy outright or hire on a weekly basis.

Below you will find our core ISO Frame office and welfare models. However, because every unit is built to order, we can adapt any model to your exact specification — including custom dimensions, upgraded insulation, additional windows and bespoke internal layouts. All prices shown are exclusive of VAT.

● Standard — Mineral Wool Insulated ● PIR — Enhanced Thermal Performance ● REI60 — 60-Minute Fire Rated ● Part L 2021 — A-Rated Energy
ISO Frame MB20K standard office cabin manufactured by KC Modular Buildings

MB20K — Standard Office

Standard

Single-module office cabin · Open-plan or partitioned

The MB20K is our entry-level ISO Frame office, ideal for site offices, security cabins and small workspaces. Because it uses mineral wool insulation as standard, it provides excellent thermal and acoustic performance at a competitive price point. Hire options are also available for short-term requirements.

Size Buy Hire/pw
20ft × 8ft MW£8,750£70
20ft × 8ft PIR£10,500£85
20ft × 10ft MW£11,750£95
20ft × 10ft PIR£13,750£115
  • ✓  Stackable to 3 storeys
  • ✓  Floor load: 2,000 kg/m²
  • ✓  Full 230V electrics included
Get a Quote →
ISO Frame MB20-25 office with WC on a UK construction site

MB20-25 — Office with WC

Standard

Self-contained office · Integrated WC facility

The MB20-25 combines a fully fitted office space with an integrated WC compartment, making it ideal for standalone site offices where separate welfare facilities are not available. In addition, both MW and PIR insulation options are offered, so you can choose the thermal performance level that suits your project.

Size Buy Hire/pw
20ft × 8ft MW£11,250£92.50
20ft × 8ft PIR£12,750£105
20ft × 10ft MW£12,750£105
20ft × 10ft PIR£14,750£121.50
  • ✓  Integrated WC compartment
  • ✓  Stackable to 3 storeys
  • ✓  Full 230V electrics included
Get a Quote →
ISO Frame MB20-26 self-contained office with bathroom by KC Modular Buildings UK

MB20-26 — Office with Bathroom

Standard

Self-contained office · Sink, WC & shower included

The MB26 is a fully self-contained unit that includes a functional bathroom with sink, WC and shower, as well as an 80L electric boiler for hot water. Because of this, it is particularly well suited to remote sites, security posts and welfare applications where mains facilities are not available. A kitchen annex option is also available.

Size Buy Hire/pw
20ft × 8ft MW£12,250£100
20ft × 8ft PIR£13,750£115
20ft × 10ft MW£14,000£115
20ft × 10ft PIR£15,750£130
  • ✓  Sink, WC & shower included
  • ✓  80L electric boiler for hot water
  • ✓  Kitchen annex option available
Get a Quote →
ISO Frame MB20-DUO twin module linked office building by KC Modular Buildings

MB20-DUO — Twin Module Office

Standard

Double-width office · Open-plan or multi-room

The MB20-DUO links two ISO Frame modules side by side to create a wider, more spacious office environment. As a result, it is ideal for larger site teams, open-plan offices and meeting rooms. Furthermore, the twin-module format allows internal partitioning into separate rooms without any structural modifications.

Size Buy Hire/pw
20ft × 16ft MW£16,000£130
20ft × 16ft PIR£18,250£150
20ft × 20ft MW£20,750£170
20ft × 20ft PIR£23,750£195
  • ✓  Two modules linked side by side
  • ✓  Internal partitioning available
  • ✓  Stackable to 3 storeys
Get a Quote →
ISO Frame REI60 fire-rated modular classroom for schools and education sector UK

REI60 — Fire-Rated ISO Unit

🔥 REI60 Fire Rated

60-min structural fire resistance · Schools, healthcare, public sector

The REI60 tier is designed specifically for environments where enhanced fire protection is a mandatory requirement — including schools, healthcare facilities, server rooms and public buildings. Because the entire frame, walls, roof and floor achieve 60-minute fire resistance, it meets the most demanding fire strategies without the need for additional suppression systems.

REI60 Construction Specification

  • ✓  Roof: 0.55mm steel · 10mm fibre board · 60mm mineral wool · vapour barrier · 60mm wool panel · 2× fire-resistant plasterboards
  • ✓  Walls: 0.5mm external steel · 120mm Rockwool fire insulation · 0.5mm internal sheet RAL 9010
  • ✓  Floor: 20mm cement-fibre board · 100mm mineral wool · 0.5mm steel underside
  • ✓  Snow load: 1.6 kN/m² · Floor load: 200 kg/m²
  • ✓  Stackable to 2 storeys (fire-rated frame)
  • ✓  REI 60: load-bearing, integrity & insulation all 60 min
  • ✓  Painted in cabin dryer for uniform finish
  • ✓  Ideal for grouped buildings or multi-unit sites
Get a Quote →
ISO Frame Part L 2021 A-rated two-storey stacked modular building by KC Modular Buildings UK

Part L 2021 — A-Rated Energy Unit

🌿 A-Rated Energy

Fully compliant with England Building Regulations Part L 2021

Our Part L 2021 A-rated tier is the highest-performance ISO Frame unit we manufacture. It is designed to achieve full compliance with England Building Regulations Part L 2021 for non-domestic buildings, delivering the lowest running costs and carbon footprint in our ISO Frame range. Furthermore, it is the preferred specification for NHS sites, local authority buildings and long-term permanent installations.

Part L 2021 Construction Specification

  • ✓  Roof: 0.5mm steel · 10mm chipboard · 125mm PIR · vapour barrier · 60mm mineral wool panel
  • ✓  Walls: External steel · 240mm mineral wool insulation · internal smooth panel RAL 9010
  • ✓  Floor: 20mm cement board · polyethylene sheet · 120mm PIR · 0.5mm steel · additional 120mm PIR · 0.5mm steel
  • ✓  Windows & glazed doors: U-value 0.5 W/m²K · anti-vision privacy film
  • ✓  Heating/Cooling: Air-to-air heat pump, SCOP 4.5
  • ✓  Floor load: 200 kg/m²
  • ✓  A-rated energy performance certificate
  • ✓  Lowest running costs in the ISO Frame range
  • ✓  Ideal for offices, classrooms & NHS sites
  • ✓  Reduced carbon footprint
Get a Quote →
🏠

Buy Outright

Purchasing your ISO Frame unit outright gives you full ownership of a relocatable, long-life asset. Because units are bolted rather than welded on site, you can move them to a new location at any point, protecting your capital investment. Standard payment terms are 40% deposit, 55% prior to delivery and 5% within 14 days of installation.

  • ✓  Full ownership — relocatable asset
  • ✓  Asset finance available (3–7 years)
  • ✓  10–15 year structural warranty
  • ✓  Framework & call-off contracts available
📅

Weekly Hire

Our weekly hire option gives you immediate access to ISO Frame units without the upfront capital commitment. As a result, it is ideal for short-term site requirements, seasonal demand and projects where flexibility is essential. Furthermore, hire-to-buy options are available if your requirements become permanent.

  • ✓  Weekly rates from £70/pw
  • ✓  No long-term commitment required
  • ✓  Hire-to-buy option available
  • ✓  Delivery & collection included in quote

Bespoke Configuration

Every ISO Frame unit is built to order, which means we can adapt any model to your exact requirements. Whether you need custom dimensions, upgraded insulation, additional windows, DDA-compliant access or a specific internal layout, our design team will produce a detailed specification and fixed price before any commitment is required.

  • ✓  Custom dimensions available
  • ✓  DDA-compliant access options
  • ✓  Bespoke internal layouts
  • ✓  Fixed price before commitment

Not sure which model is right for you?

Tell us your floor area, intended use and programme, and our team will recommend the most suitable ISO Frame model and tier — with a fixed price and lead time within 24 hours.

All prices exclude VAT. Delivery, installation and groundworks quoted separately. Lead time typically 4–8 weeks from order confirmation.

Technical Specifications

Full ISO Frame Construction & Technical Data

Every ISO Frame unit is factory-built to the same certified steel platform. The following specifications cover the Standard, REI60 and Part L 2021 tiers across all key construction elements. Because all data is drawn directly from our manufacturing documentation, you can use it confidently in tender submissions, planning applications and procurement decisions.

Tier-by-Tier Specification Comparison

Standard · REI60 Fire-Rated · Part L 2021 A-Rated

Element Standard REI60 Fire-Rated Part L 2021 A-Rated
Frame Cold-bent steel, bolted, CE marked EN 1090-1, welded per ISO 3834-2, blast-cleaned Sa 2.5 Fire-rated steel frame, painted in cabin dryer, stackable to 2 storeys Steel frame, same platform as Standard, upgraded envelope throughout
Roof 0.5mm galv. steel · 10mm chipboard · 100mm mineral wool · PE vapour barrier · 8mm laminated board 0.55mm steel · 10mm fibre board · 60mm mineral wool · vapour barrier · 60mm wool panel · 2× fire-resistant plasterboards 0.5mm steel · 10mm chipboard · 125mm PIR · vapour barrier · 60mm mineral wool panel
Walls 0.5mm exterior trapezoidal steel · 80mm mineral wool core · 0.5mm internal smooth sheet RAL 9010 0.5mm external steel · 120mm Rockwool fire insulation · 0.5mm internal sheet RAL 9010 External steel · 240mm mineral wool insulation · internal smooth panel RAL 9010
Floor 22mm P5 chipboard · 100mm mineral wool · 0.5mm galv. steel underside · 2mm commercial PVC finish 20mm cement-fibre board · 100mm mineral wool · 0.5mm steel underside 20mm cement board · PE sheet · 120mm PIR · 0.5mm steel · additional 120mm PIR · 0.5mm steel
Windows PVC frame · RAL 7016 exterior / white interior · U-value 1.1 W/m²K PVC frame · RAL 7016 exterior / white interior · U-value 1.1 W/m²K U-value 0.5 W/m²K · energy-efficient double glazing · anti-vision privacy film
Doors DDA PVC glazed 1150×2100mm · steel single 900×2000mm · 3-key cylinder lock Fire-rated doors · 60-min integrity · secure locking Glazed doors U-value 0.5 W/m²K · anti-vision privacy film
Heating 230V convector heaters 230V convector heaters Air-to-air heat pump · SCOP 4.5
Electrics Full 230V UK system · IP65 LED fittings (2×18W) · metal consumer unit · UK sockets & switches · plug-and-play installation
Floor load 2,000 kg/m² 200 kg/m² 200 kg/m²
Snow load 1.6 kN/m² (all tiers)
Stacking Up to 3 storeys Up to 2 storeys Up to 3 storeys
Fire rating Standard (no fire rating) REI 60 — load-bearing, integrity & insulation all 60 min Standard (envelope optimised for energy)
🏆

Manufacturing & Quality Certifications

Every ISO Frame unit is manufactured under a comprehensive suite of certified management systems, ensuring full traceability, structural integrity, and suitability for government, commercial, and industrial procurement.

  • ISO 9001 – Quality Management
  • ISO 1090 – Structural Steel CE Certification
  • ISO 3834 – Welding Quality Assurance
  • ISO 14001 – Environmental Responsibility
  • ISO 27001 – Information Security
  • ISO 22301 – Business Continuity
  • ISO 8501 – Surface Preparation (Sa 2.5 blast-cleaned)
  • CE marked – EN 1090-1 structural compliance
  • Constructionline Bronze – SSIP & Acclaim accredited
🎨

Colour & Finish Options

Standard RAL colours are available across both frame and wall panels, with UV-resistant coatings for long-term durability. Custom colours are available to match your corporate identity or planning requirements.

Frame RAL Options

RAL 3000 RAL 5010 RAL 7016 RAL 7035 RAL 9002 RAL 9010

Wall Panel RAL Options

RAL 5010 RAL 7016 RAL 7035 RAL 9002 RAL 9010

Interior finish: All tiers ship with RAL 9010 (pure white) smooth internal panels as standard. Flooring is 2mm commercial-grade grey PVC with sealed joints — hard-wearing, moisture-resistant, and easy to clean.

Electrical & Mechanical Systems

All ISO Frame units arrive with a complete, plug-and-play UK electrical installation. Simply connect to your site supply and the unit is operational — no additional fit-out required for standard use.

  • Full 230V UK electrical system throughout
  • IP65 LED light fittings — 2×18W per unit, sealed for longevity
  • Metal consumer unit with RCD protection
  • UK-standard sockets and switches throughout
  • Convector heaters (Standard & REI60) or air-to-air heat pump SCOP 4.5 (Part L)
  • Safe for industrial, commercial, and public-sector use

Part L A-Rated units include the heat pump as standard, delivering the lowest running costs in the ISO Frame category and a significantly reduced carbon footprint — ideal for long-term or permanent installations.

Key Structural Advantages — All ISO Frame Tiers

Regardless of which tier you choose, every ISO Frame unit shares the same engineered steel platform and factory-quality build process.

🔄

Rapid Installation & Redeployment

100% modular, transportable, and stackable. Units can be craned into position and operational within hours of delivery.

📈

Low Running Costs

High-insulation build-ups across all tiers reduce heating bills dramatically. Part L units achieve A-rated energy performance with SCOP 4.5 heat pump technology.

🕐

Flexible to Grow With You

Units can be added, extended, stacked, or relocated as your requirements change — no demolition, no waste, no planning delay for like-for-like moves.

High Structural Integrity

Engineered cold-bent steel frame, CE marked to EN 1090-1, welded to ISO 3834-2, and blast-cleaned to Sa 2.5 — built for a long service life in demanding environments.

🔒

Secure Doors & Windows

DDA-compliant glazed access doors, 3-key cylinder locks, and thermally insulated steel single doors as standard. Fire-rated options available on REI60 tier.

🔧

Minimal Maintenance

Factory-applied coatings, UV-resistant RAL panels, sealed PVC flooring, and smooth internal finishes mean minimal upkeep costs over the unit’s service life.

1.6 kN/m²

Snow Load Capacity

2,000 kg/m²

Standard Floor Load

3 Storeys

Max Stacking Height

REI 60

Max Fire Rating Available

SCOP 4.5

Heat Pump Efficiency

Sa 2.5

Blast-Clean Standard

Need a Full Technical Pack for Your Tender or Planning Application?

We can provide full construction drawings, U-value calculations, fire strategy documents, and compliance certificates for any ISO Frame tier. Contact our technical team to request your pack.

Pricing & Hire Options

Transparent Pricing — Buy or Hire, No Hidden Costs

Every ISO Frame unit is available to buy outright or hire on a weekly basis. All prices are ex-works + VAT. Delivery, installation, and crane services are quoted separately based on your site location and access requirements.

BUY or HIRE PER WEEK — both options shown in every row

Office & Portable Cabin Units — MB Series

Single-skin and insulated office modules · MW = Mineral Wool · PIR = PIR Insulation (higher spec)

All prices + VAT, ex-works
Model Size Insulation Buy Hire / week
MB 20 20ft × 8ft MW £8,000 £66 pw
20ft × 8ft PIR £9,750 £80 pw
MB 20 (wide) 20ft × 10ft MW £11,000 £90 pw
20ft × 10ft PIR £12,750 £105 pw
MB 24 24ft × 8ft MW £11,250 £92.50 pw
24ft × 8ft PIR £12,750 £105 pw
MB 20-DUO 20ft × 16ft MW £16,000 £130 pw
20ft × 20ft PIR £23,750 £195 pw
★ Large Format — Multi-Module ISO Frame
MB 20H
Office Container
50ft × 28ft Full spec £112,750 POA

Sanitary & Welfare Units — MS Series

Shower, WC, welfare & combined units · MW = Mineral Wool · PIR = PIR Insulation

All prices + VAT, ex-works
Model Size Insulation Buy Hire / week
MS 20
Shower & WC
20ft × 8ft MW £14,500 £120 pw
20ft × 8ft PIR £15,500 £130 pw
MS 20-02
Multi-station shower
20ft × 8ft MW £15,750 £130 pw
20ft × 8ft PIR £16,500 £135 pw
MS 20-03
WC, urinal & shower
20ft × 8ft MW £14,000 £115 pw
20ft × 8ft PIR £14,750 £120 pw
MS 20-23
Welfare + canteen
20ft × 8ft MW £15,000 £125 pw
20ft × 8ft PIR £15,750 £130 pw

Additional Services — Delivery, Installation & Site Works

Based on 50ft × 28ft ISO Frame project · Site-specific quotes available

Service Description Price
Installation & Assembly Full on-site installation by our certified team £16,500
HIAB Crane Unloading Crane-assisted offload and positioning on site £2,750
Load Compression Test Structural load test certification for stacked units £1,200
Site-Specific RAMS Risk assessments & method statements for your site £765
Lifting Plans Site-specific engineered lifting plans £765
Site Visit Pre-installation survey and access assessment £250
Screw Pile / Plate Foundations Ground works and foundation system — site dependent TBC
Total (50ft × 28ft, excl. foundations) £134,980

Payment Terms

40%

Deposit on order

Confirms your order and secures your production slot in our factory schedule.

55%

Before delivery

Due prior to dispatch from our factory. Unit is inspected and signed off at this stage.

5%

Within 14 days of delivery

Final retention payment due within 14 days of successful delivery and installation.

Flexible Finance & Hire-to-Buy

Not ready to buy outright? We offer several flexible procurement routes to suit your budget and project timeline.

  • Hire-to-buy — weekly hire payments contribute toward outright purchase
  • Asset finance — 3–7 year lease terms via our finance partners
  • Framework & call-off — repeat or phased orders for public sector and education clients
  • Milestone payments — phased payment schedules available for larger projects
  • No minimum order — single units, prototypes, and phased programmes all welcome

Lead Times & Delivery

Factory-built off-site means your unit is ready far faster than traditional construction — with no weather delays and no wet trades on site.

  • Standard units: 4–6 weeks from confirmed order
  • Bespoke & large format: 8–12 weeks depending on specification
  • UK-wide delivery — England, Wales & Scotland mainland as standard
  • Islands & N. Ireland — available by quotation
  • 70% faster than traditional construction on equivalent footprint

Get a Fixed-Price Quote for Your Project

All prices shown are ex-works + VAT. Tell us your size, spec, and site location and we’ll send you a full itemised quote — no obligation, no hidden costs.

All prices + VAT · Ex-works · Delivery & installation quoted separately · Subject to site survey

Sector Applications

One System, Dozens of Applications

The ISO Frame platform is used across every sector where speed, compliance, and quality matter. Whether you need a single welfare unit for a construction site or a multi-storey office complex for a school campus, the same certified steel frame and factory-quality build process delivers every time.

🏢

Commercial Offices

Open-plan or partitioned office space delivered in weeks, not months. Stackable to three storeys for multi-floor headquarters, satellite offices, or temporary project accommodation. Full electrical, heating, and IT infrastructure installed at factory.

  • Single or multi-storey configurations
  • Part L A-rated energy option
  • Buy or hire from £66/week
View modular offices →
🏫

Education & Classrooms

Rapid-deployment classrooms and teaching spaces that meet Building Regulations Part L, fire safety, and DDA accessibility requirements. Ideal for school expansions, temporary teaching blocks during refurbishment, or permanent additions to academy campuses.

  • REI60 fire-rated option for grouped buildings
  • Minimal disruption to live school sites
  • Framework & call-off procurement available
View modular classrooms →
🏥

Healthcare & NHS

Hygienic, soundproofed clinical spaces for GP surgeries, dental practices, vaccination centres, and NHS overflow facilities. Factory-finished interiors with wipe-clean surfaces, FIBO wall panels, and GEBERIT sanitary systems ensure infection-control compliance from day one.

  • FD30/FD60 fire doors available
  • Anti-mould, wipe-clean interior finishes
  • From £14,950 for a complete clinic cabin
View healthcare buildings →
🏗

Construction & Welfare

Site offices, welfare units, drying rooms, and canteen facilities for contractors and civil engineering projects. Hire or buy with flexible terms. Fully compliant with CDM welfare requirements, with sanitary units featuring GEBERIT plumbing and 120L water heaters.

  • Hire from £50/week (10ft units)
  • Shower, WC & canteen combinations
  • Relocatable between project sites
View welfare units →

Sports & Leisure

Changing rooms, pavilions, clubhouses, ticket offices, and spectator facilities for sports clubs, leisure centres, and outdoor venues. Modular construction means minimal pitch-side disruption and the ability to expand as your club grows.

  • Custom layouts for changing & shower areas
  • DDA-accessible entrances & facilities
  • Durable, low-maintenance finishes
View sports buildings →
🔒

Accommodation & Security

Staff accommodation, security cabins, gatehouse units, and temporary housing for remote sites, events, or emergency deployment. Stackable to three storeys for high-density configurations. REI60 fire-rated tier available for multi-occupancy buildings.

  • Stackable to 3 storeys for high-density use
  • REI60 fire-rated for multi-occupancy compliance
  • Rapid deployment for emergency or event use
View accommodation units →
🏛

Public Sector & Councils

Local authorities, housing associations, and public bodies benefit from framework and call-off procurement, phased delivery, and full compliance documentation. Our Constructionline Bronze and SSIP accreditations satisfy most public sector supply chain requirements.

  • Constructionline Bronze & SSIP accredited
  • Framework & call-off contracts supported
  • Full compliance pack: RAMS, O&M, warranties
View public sector solutions →
🏪

Retail, Showrooms & Pop-Up

Branded retail units, showrooms, ghost kitchens, and pop-up venues that look permanent but can be relocated when your business moves. Custom RAL colour cladding, large glazed frontages, and full electrical fit-out available as standard.

  • Custom RAL colour & cladding options
  • Large glazed frontages available
  • Fully relocatable — move with your business
View showrooms & retail →
🏭

Storage & Industrial

Secure, weatherproof storage units, workshops, server rooms, and equipment shelters. Anti-corrosion steel frame, IP65 electrical fittings, and robust insulated panel construction make ISO Frame units ideal for demanding industrial environments.

  • Anti-corrosion steel, IP65 electrical
  • Stackable for high-density storage
  • Suitable for server rooms & secure equipment
View storage units →

ISO Frame Deployments Across the UK

9+

Sectors served
across the UK

70%

Faster than traditional
construction

3

Stackable storeys
from one system

50+

Year design
lifespan

ISO

9001 · 1090 · 3834
certified manufacture

A

Energy rating
Part L 2021 compliant

Certifications & Accreditations Applicable Across All Sectors

ISO 9001

Quality Management

ISO 1090 & 3834

Steel & Welding

ISO 14001

Environmental

Constructionline Bronze

Supply Chain Verified

SSIP Accredited

Health & Safety

Part L 2021

Energy Compliance

REI 60 Fire Rated

Enhanced Fire Protection

DDA Accessible

Part M Compliant

Not Sure Which Configuration Is Right for You?

Our team works with clients across every sector listed above. Tell us your project size, site location, and intended use — we’ll recommend the right ISO Frame tier, layout, and procurement route within 24 hours.

Discuss Your Project → Call 01782 561 110

Mon–Fri 8am–6pm · Free site survey available

Compliance & Certifications

Built to Every Standard That Matters

Every ISO Frame unit leaves our factory with a full compliance pack. From structural certification to fire safety, energy performance, and health & safety accreditations — we handle the paperwork so your project stays on programme.

Structural & Manufacturing

  • ISO 9001:2015

    Quality management system — every unit manufactured under a certified QMS with full traceability.

  • ISO 1090 & ISO 3834

    Steel fabrication and welding certification. Required for structural steel in UK and European construction.

  • PN-EN ISO 8501

    Surface preparation and anti-corrosion coating standard. Ensures long-term structural integrity.

  • 10–15 Year Structural Warranty

    Steel and timber frame structural warranty. Extended warranties available for public sector clients.

🔥

Fire Safety & Building Regs

  • REI 60 Fire Rating

    Load-bearing, integrity, and insulation maintained for 60 minutes. Required for schools, healthcare, and multi-occupancy buildings.

  • FD30 & FD60 Fire Doors

    Certified fire doors fitted as standard on REI60 units. FD60 available for high-risk or multi-storey configurations.

  • Building Regulations Part B

    Fire safety compliance for means of escape, internal fire spread, and external fire spread.

  • Emergency Lighting

    Factory-installed emergency lighting on REI60 and Part L units. Tested and certified prior to delivery.

🌿

Energy & Environment

  • Building Regulations Part L 2021

    A-rated energy envelope on Part L tier. KINGSPAN QuadCore panels achieve U-values of 0.11–0.18 W/m²K.

  • ISO 14001:2015

    Environmental management system. Responsible sourcing, waste reduction, and sustainable manufacturing processes throughout production.

  • SCOP 4.5 Heat Pump

    Air-to-air heat pump on Part L units delivers highly efficient heating and cooling — significantly reducing operational energy costs.

  • Triple-Glazed Windows

    U-value 0.7 W/m²K on Part L tier. Aluminium or PVC frames with DDA-compliant opening options available.

Health, Safety & Supply Chain

  • SSIP Accreditation

    Safety Schemes in Procurement — independently verified health & safety management. Accepted by most UK principal contractors.

  • Constructionline Bronze

    Pre-qualification verified by Constructionline. Simplifies procurement for public sector and framework clients.

  • CDM 2015 Compliance

    Full Construction Design and Management compliance. Site-specific RAMS, lifting plans, and method statements provided for every project.

  • ISO 27001 & 22301

    Information security and business continuity management — relevant for public sector, NHS, and data-sensitive clients.

Accessibility & Part M

  • Building Regulations Part M

    Access and use compliance. Wider doorways, level thresholds, and DDA-compliant sanitary facilities available across all unit types.

  • DDA-Compliant Windows & Doors

    Low-threshold aluminium entrance doors and accessible window opening hardware. Suitable for schools, healthcare, and public buildings.

  • Accessible Sanitary Units

    Wheelchair-accessible WC and shower configurations available on MS Series welfare units. GEBERIT fittings with 25-year warranty.

  • Ramped Access Options

    External ramps and steps supplied and installed to suit ground level and site conditions. Quoted per project.

Electrical & Mechanical

  • PN-HD 60364 Electrical

    UK 230V electrical installation standard. Full RCD consumer unit, IP65 LED lighting, and certified wiring on every unit.

  • GEBERIT Plumbing Systems

    25-year manufacturer warranty on all GEBERIT sanitary systems. Factory-installed and pressure-tested before delivery.

  • MVHR Ventilation

    Mechanical ventilation with heat recovery on Part L units. Complies with Building Regulations Part F for air quality and ventilation.

  • Fire Alarm Integration

    Fire alarm and detection systems factory-wired and ready for site connection. Emergency lighting included on REI60 and Part L tiers.

Request a Full Compliance Pack

Every project includes a complete compliance documentation pack: ISO certificates, structural calculations, RAMS, O&M manual, electrical certification, and warranty schedule. Available on request prior to order.

Request Compliance Pack →
ISO 9001 ISO 1090 ISO 14001 SSIP Constructionline Part L 2021 REI 60 CDM 2015
FAQ

Frequently Asked Questions

Everything you need to know about the ISO Frame Modular Buildings system — from sizing and lead times to planning permission and stacking configurations.

What sizes are available for ISO Frame modular buildings?

ISO Frame units are available in four standard sizes: 10ft × 8ft (anti-vandal cabin), 20ft × 8ft (standard office/welfare), 32ft × 10ft (large open-plan), and 50ft × 28ft (multi-room complex). Custom sizes are available on request for bespoke projects.

Can ISO Frame units be stacked to create multi-storey buildings?

Yes. ISO Frame units are engineered to stack up to three storeys high. Each unit undergoes load compression testing to verify structural integrity for stacking. Multi-storey configurations require site-specific structural calculations, HIAB crane installation, and engineered lifting plans — all of which we provide as part of the project package.

Do ISO Frame modular buildings require planning permission?

It depends on the intended use, duration, and site. Temporary structures used for fewer than 28 days may fall under permitted development. Permanent or semi-permanent installations typically require planning permission. We recommend consulting your local planning authority. We can provide technical drawings and specifications to support your application. See GOV.UK Building Regulations guidance for further detail.

What is the difference between the Standard, REI60, and Part L tiers?

The Standard tier uses mineral wool insulation and is suited to storage, site offices, and short-term use. The REI60 tier adds 60-minute fire resistance, certified fire doors, and emergency lighting — required for schools, healthcare, and multi-occupancy buildings. The Part L tier is our highest-specification unit: KINGSPAN QuadCore insulation, triple-glazed windows, SCOP 4.5 heat pump, and A-rated energy performance compliant with Building Regulations Part L 2021.

How long does it take to manufacture and deliver an ISO Frame unit?

Standard units are ready in 4–6 weeks from confirmed order. Bespoke or large-format configurations take 8–12 weeks. We deliver UK-wide to England, Wales, and mainland Scotland as standard. Northern Ireland and island deliveries are available by quotation.

Can I hire an ISO Frame unit rather than buying outright?

Yes. We offer weekly hire from £50/week for 10ft anti-vandal cabins up to £200+/week for large 50ft × 28ft complexes. Hire-to-buy is also available, where weekly hire payments contribute toward the outright purchase price. Asset finance over 3–7 years is available via our finance partners.

What foundations are required for an ISO Frame modular building?

Foundation requirements depend on ground conditions, unit size, and whether the building will be stacked. Options include screw pile foundations, concrete pad foundations, and adjustable steel plate systems. We carry out a pre-installation site survey to assess ground conditions and recommend the most appropriate solution. Foundation costs are quoted separately per project.

Are ISO Frame buildings fully relocatable?

Yes. Units can be disconnected from services, lifted by HIAB crane, transported, and reinstalled on a new site. This makes them ideal for businesses that may need to move, expand, or repurpose space in the future — with no loss of asset value.

What warranties are included with an ISO Frame modular building?

ISO Frame units include a 10–15 year structural warranty on the steel frame, 5–10 years on insulated panels and roof, 5 years on windows and doors, and 12–24 months on internal workmanship and installation. GEBERIT plumbing systems carry a 25-year manufacturer warranty. Extended warranties are available for public sector and framework clients.

Do you supply ISO Frame buildings across the whole of the UK?

Yes. We deliver and install across England, Wales, and mainland Scotland as standard. Deliveries to Northern Ireland, Scottish islands, and other UK islands are available by quotation. For large or bespoke projects, we can also deliver to selective mainland European locations. Contact us for a delivery quote to your specific site.

Have a question not covered here? Our team responds within 24 hours.

Ask a Question →
How It Works

From Enquiry to Installation in 5 Steps

Our process is designed to give you certainty at every stage — fixed pricing, clear timelines, and a single point of contact from first call to handover.

1

Enquiry & Consultation

Tell us your requirements — size, use, location, and timeline. We’ll discuss the best ISO Frame tier for your project and provide an initial budget estimate within 24 hours.

Free consultation 24-hour response No obligation
2

Site Survey & Specification

We visit your site to assess access, ground conditions, and service connections. Based on the survey, we finalise the specification, layout, and provide a fixed-price quotation with full itemised breakdown.

Site visit £250 Fixed-price quote Full spec document
3

Order & Factory Production

On receipt of your 40% deposit, production begins in our factory. Your unit is manufactured under ISO 9001 quality management with full traceability. 90% of all work is completed off-site — no weather delays, no wet trades.

40% deposit to start 4–12 weeks build ISO 9001 certified
4

Delivery & Installation

Your unit is transported to site and positioned by HIAB crane. Our certified installation team connects all services — electrical, plumbing, heating — and completes final fit-out. 55% payment is due before dispatch; the building is inspected and signed off at factory prior to loading.

55% before delivery HIAB crane positioning Full service connection
5

Handover & Aftercare

Final 5% retention is due within 14 days of delivery. You receive a full compliance pack including O&M manual, electrical certification, structural warranty, RAMS documentation, and all ISO certificates. Our aftercare team is available for any post-installation queries.

5% final retention Full compliance pack Ongoing aftercare

Ready to start? Most projects move from enquiry to installation in under 12 weeks.

Get Started Today

Your ISO Frame Modular Building Starts Here

Whether you need a single portable cabin or a multi-storey modular complex, our team will guide you from first enquiry to completed installation. Fixed pricing, certified quality, and UK-wide delivery as standard.

Free consultation & 24-hour quote turnaround
Fixed-price quotations — no hidden costs
ISO 9001, 1090, 14001 certified manufacture
Buy, hire, or hire-to-buy — flexible procurement
4–12 week lead times · UK-wide delivery & install

Get a Free Quote

Tell us about your project and we’ll send a fixed-price quotation within 24 hours.

No obligation · Fixed-price quotes · Response within 24 hours
Or call 01782 561 110 to speak to our team now

Certified

ISO 9001 · 1090 · 14001

Accredited

Constructionline Bronze

Health & Safety

SSIP Accredited

Energy

Part L 2021 · A-Rated

Fire Safety

REI 60 Rated

Delivery

UK-Wide · 4–12 Weeks

Client Reviews

What Our Clients Say

Trusted by businesses, schools, and organisations across the UK. Here’s what clients say about working with KC Modular Buildings.

500+

Projects completed
across the UK

4.9

Average client
satisfaction rating

4–12

Week average
delivery time

15yr

Structural warranty
on every build

70%

Faster than traditional
construction

90%

Factory-completed
before site arrival

“The building turned out incredible and the construction is a testimony to the integrity of KC Modular Buildings. Professional service from start to finish. Delivered on time and exactly to specification.”
JW

James Whitfield

Facilities Manager · Surrey County Council

Project: Pendell Camp Utility Blocks

“We needed a modular classroom fast — KC Modular delivered in 6 weeks. The quality is exceptional, the team were professional throughout, and the children love their new space.”
SB

Sarah Brennan

Head Teacher · Primary Academy Trust

Project: Modular Classroom Extension

“Used KC Modular for a site office and welfare unit on a large civil engineering project. Hire process was straightforward, units arrived on time, and quality was far above what we expected at that price point.”
MD

Mark Davies

Contracts Manager · Civil Engineering Contractor

Project: Site Office & Welfare Hire

“We commissioned a bespoke ISO Frame multi-storey office complex. KC Modular’s engineering team handled everything — design, compliance, installation. The result is a world-class workspace that cost a fraction of traditional construction.”
RP

Richard Palmer

Operations Director · Commercial Developer

Project: Multi-Storey ISO Frame Office Complex

“Ordered a Part L A-rated ISO Frame unit for our healthcare clinic. The KINGSPAN QuadCore panels, triple-glazed windows, and heat pump system have cut our energy bills significantly. Fully NHS-compliant and installed in under two weeks.”
DH

Dr. Helen Forsyth

Practice Manager · NHS Primary Care

Project: Modular Medical Clinic Unit

“KC Modular supplied six stackable ISO Frame units for our logistics hub. The REI 60 fire-rated spec gave us full compliance without compromise. Exceptional build quality and the team’s technical knowledge is second to none.”
TN

Tom Nicholson

Site Director · Logistics & Distribution

Project: REI 60 Multi-Unit Logistics Hub

Verified Reviews Across Platforms

Google Reviews

4.9 / 5

Based on 47 reviews

Read Reviews →

Facebook Reviews

5.0 / 5

Based on 23 reviews

Read Reviews →

Constructionline

Bronze Member

Verified & accredited supplier

Verify Status →

SSIP / Acclaim

Accredited

Health & Safety certified

View Certs →

Happy with your KC Modular building?

Your review helps other businesses, schools, and organisations make the right decision. It takes less than 2 minutes.