






15.75m × 9.45m Modular Café Building – KC Bespoke
£264,950.00+ VAT — £317,940.00 incl. VAT
15.75m × 9.45m modular cafe building from KC Bespoke, providing approximately 148.84m² of stated footprint for a planned café, coffee shop or restaurant layout. The building package includes insulated steel-frame construction, internal partition panels, scheduled sanitary fittings and FD30 doorsets, triple-glazed laminated UPVC windows, Class 42 SPC flooring and air-to-air heat-pump heating and cooling.
- Stated overall dimensions
- 15.75m × 9.45m
- Calculated footprint
- Approx. 148.84m²; not net usable dining or kitchen area
- Construction
- KC Bespoke steel-frame modular building
- Internal fit-out
- Partition panels, flooring and sanitary specification to agreed schedules
- Windows
- Triple glazing with laminated safety glass
- Heating & cooling
- Included air-to-air heat pump; specified SCOP 4.5
- Catering equipment
- Separately specified; not included unless itemised
- Delivery & assembly
- Scope and price inclusion to be agreed
The supplied £264,950 is treated as excluding VAT, following the established listing convention; confirm this tax basis before publication. The amount covers the stated building specification, not a fully equipped café business. Delivery, unloading, lifting, assembly, site works and final connections are not confirmed inclusions. Zero additional-delivery fields are unset amounts, not free shipping. Agree the complete catering fit-out, services, logistics and order total before payment.
This is a building purchase, not a fully equipped café, operating business or towable coffee vehicle. The menu, room plan and selected equipment define the catering services and extraction requirements. No seating capacity is assigned. Confirm the complete fit-out, delivery and final connections before order.
Available to order
KC Bespoke | Café and hospitality premises | Approx. 148.84m²
A modular cafe building for coffee, dining and customer service
Create purpose-designed premises for your café operation with this 15.75m × 9.45m KC Bespoke building. Develop the available footprint around customer seating, an ordering counter, preparation space, storage and sanitary accommodation, with insulated construction, scheduled internal finishes and included heat-pump climate control.
The £264,950 price is treated as excluding VAT for this configuration. It covers the stated building package, not land, a lease, business goodwill or a complete commercial kitchen. Catering equipment, unitemised services and delivery terms are agreed in the project quotation.
The stated dimensions give an exact footprint of 148.8375m², displayed as approximately 148.84m². This is not a dining-area or seating-capacity figure. The finished wall build-up, kitchen and preparation zones, customer routes, toilets, storage and staff facilities determine the usable layout.
The material specification includes high-strength closed steel profiles, Kingspan insulated wall panels or an agreed equivalent, 100mm internal partition panels, a 160mm specified roof assembly with Protan SE 2.0 membrane, an 18mm cement-bonded chipboard floor deck and Class 42 SPC flooring. Windows are specified with triple glazing and laminated safety glass.
The scheduled sanitary package and air-to-air heat-pump heating and cooling remain included. System capacity, unit quantities, room arrangements and service connections must suit this larger café and the selected appliances; the package does not copy the equipment quantities of a smaller building.
Develop a coffee-led operation, a pop up cafe at an agreed site, or a modular restaurant building brief around the proposed menu. Espresso equipment, serving counters, refrigeration, cooking appliances, washing-up facilities, furniture and kitchen extraction require their own itemised schedule and quotation.
Comparing container cafe design? This is a purpose-built KC Bespoke steel-frame building, not a converted freight container or an ISO Frame module. Compare layout, glazing, insulation, service routes and the complete installed scope rather than assuming the construction systems are interchangeable.
Standard listed steel-cladding colours are included. Wood-effect cladding, brick slips and decorative stone remain premium upgrades. Agree signage, serving hatches, terrace areas, awnings and any other additional features rather than treating them as standard equipment.
For food-use coordination, consult Food Standards Agency guidance on starting a food business and HSE catering ventilation guidance. These are operational design references, not additions to the included building package or approval to trade.
Browse cafés, kiosks and takeaways and restaurants and bars, or download the KC Bespoke Collection catalogue (PDF). Send your menu, site postcode and preferred layout for a coordinated building and catering-fit-out quotation.
- Stated overall dimensions
- 15.75m × 9.45m
- Calculated footprint
- Approx. 148.84m²
- Specified wall / roof / floor U-values
- 0.18 / 0.11 / 0.11 W/m²K
- Specified window U-value
- 0.9 W/m²K
- Specified entrance-door U-value
- 1.1 W/m²K
- Heating & cooling
- Air-to-air heat pump; specified SCOP 4.5
Applications and layout options
Independent café and coffee-shop operators
Modular Cafe Building
Develop customer seating, an ordering counter, preparation, storage and support rooms around the proposed menu. The fitted building specification is coordinated with separately selected café equipment and furniture.
Temporary trading locations
Pop Up Cafe Premises
Plan a modular venue for an agreed trading location and duration. Delivery, supports, utility connections and local approvals still require assessment; this is not a wheeled catering kiosk or a short-term hire price.
Restaurant and hospitality operators
Modular Restaurant Building
A restaurant arrangement can be developed subject to the kitchen equipment, extraction, dining layout, access and services design. No ready-equipped cooking line, fixed cover count or operational approval is included.
Visitors, leisure and business sites
Café Accommodation for an Existing Site
Consider dedicated food-and-drink premises alongside an existing operation. Any shared utilities, access routes, external seating or physical link to another building must be expressly scoped.
Indicative product specification
Use this table as a configuration guide. The written quotation and approved drawings control the final product, interfaces and project-specific compliance.
| Product line | KC Bespoke steel-frame modular building |
|---|---|
| Stated overall dimensions | 15.75m × 9.45m; final dimension basis and finished measurements to approved drawings |
| Calculated footprint | 148.8375m² exactly from the supplied dimensions; displayed as approximately 148.84m², not usable internal or dining area |
| Heights and transport sections | Internal and overall heights, module division, transport dimensions, weights and lifting details to project drawings |
| Purchase scope | New building available to order; not an existing café business, land sale, lease, vehicle or hire offer |
| Layout | Customer areas, counter, preparation, kitchen, storage, sanitary rooms and staff accommodation to the approved plan |
| Capacity | No customer seats, covers, serving capacity, staff count or fixture quantity assigned from the footprint |
| Customer arrival | Coordinate entrance, queueing, ordering, collection, seating and accessible circulation within the measured internal area |
|---|---|
| Counter and coffee station | Agree counter dimensions, equipment, water treatment, drainage, electrical loads and display needs; counters and appliances are separate unless itemised |
| Menu and preparation | Define the menu and cooking method before fixing preparation, cooking, refrigeration and extraction space |
| Washing-up and handwashing | Set the required handwashing, food-washing and equipment-cleaning arrangements in the catering design; the sanitary-room schedule alone does not define them |
| Support facilities | Agree dry/cold storage, deliveries, staff areas, sanitary provision and waste routes without assuming room counts |
| Services and access | Coordinate escape, thresholds, customer access and separation of food preparation, customer circulation and service routes |
| External features | Serving hatches, terraces, awnings, signs, outdoor tables and landscaping are additional only where expressly scheduled |
| Primary frame | High-strength closed steel profiles |
|---|---|
| Protection | Anti-corrosive coating to structural steel |
| Manufacturing approach | Factory-prepared modular construction with engineered alignment and connections |
| Engineering | Frame design, applicable EN references, member sizes, support reactions, module connections and lifting details to project-specific documentation |
| Scope of evidence | No execution class, stacking capability, floor load or certificate number has been supplied for this model |
| Panel family | Kingspan KS1000/1150 TL panels or agreed equivalent |
|---|---|
| Specified wall U-value | 0.18 W/m²K |
| Reaction-to-fire reference | EN 13501-1 B-s2,d0, as supplied for the panel system |
| Fire-resistance references | EW 45 (o↔i) — stated 4m; EI 30 (o↔i) — stated 7.5m, as supplied |
| Acoustic reference | 25 (-3,-5) dB as supplied for the panel; not a complete-café or room-to-room acoustic rating |
| Installation | Vertical or horizontal where supported by the chosen system documentation |
| Mineral-wool option | A mineral-wool-core alternative may be separately selected; it is not assumed to be the standard QuadCore core |
| Evidence | Confirm wall panel thickness, span, orientation, fixings, junctions and supporting test evidence for the exact selected product |
| Partition system | Kingspan QuadCore KS1150TL, 100mm |
|---|---|
| Finish | Double-sided white finish |
| Included layout basis | Internal partition panels to the agreed café room schedule; no wall length or room count is supplied |
| Cleaning and acoustic design | Agree cleaning-product compatibility and any additional acoustic treatments; the panel description does not establish a maintenance-free or soundproof room |
| Insulated assembly | Kingspan QuadCore KS1150TL, 160mm, specified within the roof build-up |
|---|---|
| Specified roof U-value | 0.11 W/m²K |
| Membrane | Protan SE 2.0 |
| Membrane characteristics | UV-resistant, flame-retardant membrane with welded seams as described in the brief; detail to the selected system |
| Assembly coordination | Confirm panel suitability, structural supports, substrate, membrane compatibility, falls, outlets and roof-edge details for the complete assembly |
| Solar provision | Solar equipment is not itemised. Any solar installation requires an agreed structural, fixing and membrane-compatibility review |
| Structure | Insulated steel floor system |
|---|---|
| Specified floor U-value | 0.11 W/m²K for the completed floor assembly, not the steel frame alone |
| Deck | 18mm cement-bonded chipboard |
| Finish | SPC rigid-core vinyl flooring |
| Use classification | Class 42 as supplied |
| Appearance | Wood or stone texture selected from the agreed flooring range |
| Water resistance | Waterproof SPC product; joints, edges and penetrations follow the selected installation system, not a whole-room tanking guarantee |
| Food-use floor selection | Class 42 SPC remains the supplied base finish. Confirm slip performance, cleaning and chemical compatibility, joints, wet/greasy preparation zones and catering-equipment loads. Any alternative kitchen floor system must be explicitly designed and quoted; no blanket commercial-kitchen suitability or numerical floor-load rating is supplied. |
| Entrance doors | Aluminium entrance-door system with customisable RAL colour and high-security locking |
|---|---|
| Specified entrance-door U-value | 1.1 W/m²K |
| Window frames | Multi-chamber UPVC |
| Window glazing | Triple glazing with laminated safety glass |
| Specified window U-value | 0.9 W/m²K |
| Opening schedule | Counts, sizes, positions, opening types, clearances, thresholds and hardware to the approved drawings |
| Door glazing | The triple-glazing statement applies to windows; any entrance-door glazing must be confirmed in the door schedule |
| Glazing performance | Confirm the laminate build-up and safety classification. No universal UV-blocking percentage, forced-entry rating, sound reduction or storm-resistance result is asserted for unspecified glazing |
| Fire rating | FD30 doorsets to the approved fire and opening schedule |
|---|---|
| Smoke control | Specify compatible smoke-control seals and hardware where required by the complete doorset and fire strategy |
| Acoustic properties | Acoustic requirements and supporting doorset data to the schedule; no numerical performance supplied |
| Scope | FD30 elements do not establish a whole-building fire-resistance rating |
| Toilets | GEBERIT wall-hung toilets to the agreed sanitary schedule |
|---|---|
| Storage | Quality under-sink cabinets |
| Wall finishes | Rocko Tiles, 2800 × 1230 × 4mm, vertical format |
| Wet-area detailing | Waterproof, easy-clean finishes with compatible joints, edges and sealed penetrations |
| Quantities and accessibility | Fixture counts, room layout, basin provision, door clearances and accessible arrangements to the agreed plan; no fixture count is inferred |
| Services | Define water supply, hot-water equipment, temperature control, internal drainage and external connection responsibilities |
| Catering equipment distinction | The sanitary package is not a commercial kitchen fit-out. Coffee machines, catering sinks, preparation counters, refrigeration, dishwashers and cooking equipment are not automatically included. |
| Included system | Air-to-air heat pump for heating and cooling |
|---|---|
| Specified SCOP | 4.5, subject to the selected equipment and declared operating conditions |
| Equipment schedule | Capacity, number of units, controls, indoor/outdoor positions, noise criteria and commissioning to the final café design |
| Supply distinction | Included in this current building specification; not an optional carry-over from the earlier office package |
| Ventilation distinction | The heat-pump description does not establish fresh-air ventilation, a cooking canopy, grease/fume extraction or replacement-air provision. Catering ventilation is separately designed and quoted. |
| Cladding | Hidden-fix steel elevation panels |
|---|---|
| Substrate | Hot-dip galvanised steel |
| Design | Cassette arrangement, flashings, openings and any signage fixing locations to approved elevations |
| Scope | Base finish is the agreed steel-panel specification; premium façade materials remain optional |
| RAL range | 1015, 3000, 3009, 3011, 5010, 6029, 7016, 7024, 7035, 8004, 8017, 9002, 9006, 9007 and 9010 |
|---|---|
| Other standard finish | Galvanised |
| Pricing basis | No surcharge for the listed standard steel-cladding and flashing finishes |
| Selection | Confirm colour samples, distribution and the final elevation treatment before manufacture; no product image or colour selection has been supplied for this café |
| Options | Golden Oak, Dark Walnut and Winchester |
|---|---|
| Commercial status | Premium upgrade, separately quoted |
| Selection | Agree the actual cladding product, exterior suitability, support details and coverage; the finish name does not establish timber-frame construction |
| Brick-slip options | Nicea 1 NEW / Nicea; Boston 1 / Boston with joint; Bronx Red 1 on request / Bronx Red with joint; Cambridge 13 / Cambridge; Country 610 / Country; Dallas 1 NEW / Dallas with joint; Dublin 3 / Dublin with joint; Monsanto 1 / Monsanto with joint; Rustik 540 / Rustik |
|---|---|
| Decorative-stone options | Alzano; Amsterdam; Calabria 1 / Calabria; California; Grenada 1 / Grenada; Jura 1 / Jura; Kenya 1 / Kenya; Lyon 1 / Lyon; Madera 2 / Madera; Mexicana 3 / Mexicana; Nepal; Palermo; Roma 1 / Roma; Sierra; Timber 1 / Timber; Toledo 2 / Toledo |
| Joint finish | Jointed or unjointed where available for the selected product |
| Commercial status | Optional premium upgrade; confirm product, quantities, coverage and price |
| Technical coordination | Confirm exterior suitability, substrate, attachment, weather exposure, fire performance and movement details before manufacture |
| Operational guidance — separate from the supplied specification | Food Standards Agency premises guidance addresses cleanable surfaces, handwashing, water, drainage and ventilation. These are design checks for the actual menu and locality, not a declaration that this base package is ready to trade. |
|---|---|
| Catering equipment | Espresso machines, grinders, cooking appliances, fridges, freezers, displays, dishwashers, counters, catering sinks, water treatment and loose furniture are not itemised building inclusions |
| Kitchen ventilation | HSE catering guidance describes the need to remove cooking fumes and heat, provide general ventilation and address replacement air. Agree the appropriate system for the selected equipment with a competent designer; it is separate from the comfort heat pump. |
| Extract installation | Canopies, ducts, roof/wall penetrations, discharge position, noise, grease control, replacement air and any fire-protection interfaces require a coordinated and priced specialist schedule |
| Services | Agree electrical capacity and circuits, water, hot water, waste drainage, any grease management and gas equipment if selected; no gas installation is part of the supplied brief |
| Floor and wall finishes | Retain the supplied finishes as the base specification. Confirm suitability for dining, washing-up, wet preparation and cooking zones; price any required specialist hygienic or slip-resistant treatment explicitly |
| Completion | Coordinate equipment installation, inspection, commissioning, documentation and operator responsibilities before trading. No food hygiene rating or operating licence is supplied with the building |
| Electrical installation | The master specification does not itemise a complete electrical or lighting package. Agree incoming supply, distribution, socket circuits, lighting, emergency systems and testing responsibilities |
|---|---|
| Included building services | Heat-pump heating/cooling and sanitary fixtures remain included to the approved schedules; capacity and quantities are sized for this café |
| Catering interfaces | Coordinate equipment locations, coffee-water treatment, hot-water demand, refrigeration heat gains, waste routing and maintenance access before manufacture |
| Additional equipment | Data, till/payment systems, Wi-Fi, security, specialist catering controls, signage and branding are separately itemised |
| Handover | Allocate final connections, checks, commissioning and documentation for the complete building and selected catering systems |
| Construction identity | Purpose-built KC Bespoke steel-frame modular construction, not a converted shipping container or ISO Frame cabin |
|---|---|
| Container cafe design | Compare layout, servicing, glazing, insulation, finished space and installed scope without assuming freight-container dimensions, lifting points or stacking capability |
| Pop up cafe use | A possible use for an agreed site and duration, not a promise of instant deployment, no permissions, a towable format or daily relocation |
| Mobile coffee business for sale | A comparison search term only. This listing sells a modular building, not a trading coffee business, franchise, van, trailer, customer list, equipment inventory, trading pitch or goodwill |
| Future moves | A later move depends on structural condition, module connections, handling access, disconnection, route and receiving-site design; separately scoped and priced |
| Part L reference | The inherited brief references Part L 2021. Confirm the applicable standards and transitional route using Approved Document L guidance for England; no automatic approval is claimed. |
|---|---|
| Optional A energy rating | An assessed design objective, not an issued EPC or a guaranteed rating for this building |
| Planning and Building Regulations | Review planning requirements and Building Regulations approval for the site and relevant UK jurisdiction. Temporary or modular construction does not itself establish an exemption. |
| Food-business operation | Check food-business registration and other operating requirements for the proposed location. FSA guidance covers England, Wales and Northern Ireland; use the relevant Scottish authority guidance for a Scottish installation. No registration, licence or inspection rating is included. |
| Evidence ownership | Manufacturer declarations, calculations and test reports must match the selected products and assembled building. Manufacturer certificates do not become certificates held by KC Cabins Solutions Ltd |
| Performance limits | The panel fire/acoustic references, U-values, doorset descriptions and SCOP are supplied specification data, not independent certification of the completed café |
| Initial logistics | Delivery, unloading, lifting and assembly inclusion, geographic coverage and charges must be agreed; none is confirmed as included by the supplied price |
|---|---|
| Building size and module division | The overall 15.75m × 9.45m footprint does not describe a single transport load. Module count, section sizes, weights, joints and lifting method require approved drawings |
| Supports and utilities | Groundworks, foundations, access works and final mains connections require a separately allocated scope |
| Later relocation | Future dismantling, transport, assembly, foundations and reconnection are separate engineered and priced works |
| Programme | No fixed lead time, percentage time saving or guaranteed launch date supplied; agree manufacture, installation and commissioning after the design and site review |
| Price basis | £264,950 treated as excluding VAT; £317,940 including the configured 20% VAT. Confirm this tax basis and the complete services, catering and logistics quotation before payment |
Scope, responsibilities and assumptions
Included in the stated modular café building specification
- 15.75m × 9.45m KC Bespoke steel-frame modular café building to approved drawings
- High-strength closed steel profiles with anti-corrosive protection
- External Kingspan KS1000/1150 TL panels or agreed equivalent, with specified wall U-value 0.18 W/m²K
- 100mm Kingspan QuadCore KS1150TL internal partition panels, double-sided white, to the agreed layout
- 160mm specified roof assembly with Protan SE 2.0 membrane and specified roof U-value 0.11 W/m²K
- Insulated steel floor system with 18mm cement-bonded chipboard deck and specified floor U-value 0.11 W/m²K
- Class 42 SPC rigid-core vinyl floor finish from the agreed selection
- Multi-chamber UPVC windows with triple glazing and laminated safety glass to the opening schedule
- Aluminium entrance doors with agreed RAL colour and high-security locking
- FD30 internal doorsets to the agreed fire and opening schedule
- GEBERIT wall-hung toilets, under-sink cabinets and Rocko Tiles finishes to the agreed sanitary schedule
- Air-to-air heat-pump heating and cooling with specified SCOP 4.5, sized for the approved café design
- Hidden-fix steel elevation panels and flashings in a listed standard finish
Separate catering equipment, site works and optional upgrades
- Coffee machines, grinders, cooking appliances, refrigerators, freezers, display equipment and dishwashers unless itemised
- Serving counters, catering sinks, specialist preparation surfaces, kitchen cabinetry and water-treatment equipment unless itemised
- Kitchen extraction, canopies, ducts, replacement air, grease management and any associated specialist fire or gas systems unless itemised
- Complete electrical, lighting, hot-water, fresh-air and catering-services packages where not expressly identified in the order
- Any food-use finish upgrades required by the selected preparation/cooking zones beyond the agreed base finishes
- Tables, chairs, loose furniture, crockery, utensils, till systems, IT/data, CCTV, signs and branding
- Premium wood-effect cladding, brick slips and decorative-stone finishes
- Serving hatches, canopies, outdoor seating, terrace/decking, ramps, paths, fences and landscaping unless expressly included
- Groundworks, foundations, supporting base and other site preparation
- Incoming utility supplies and final power, water, drainage and data connections
- Land, property interests, trading pitch, operating-business assets, goodwill, franchises and business registration
- Statutory applications and professional services unless allocated in writing
- Later dismantling, transport, relocation, reassembly and receiving-site connections
Order and catering-design confirmations
- Treat the supplied 264950 as £264,950 excluding VAT under the established pricing convention; confirm the tax basis before live publication
- Confirm the overall measurement basis, finished internal area, heights, module division and transport details on drawings
- Agree the menu, counter, seating, kitchen, preparation, washing-up, storage, sanitary and staff layouts without deriving seat counts from 148.84m²
- Retain included partition panels, scheduled sanitary fit-out and heat-pump climate control; do not apply earlier office-option exclusions
- Document the exact selected wall/roof/floor assemblies and supporting performance data
- Coordinate catering equipment, extraction, drainage, hot water, supply capacities and any specialist finishes before manufacture
- Size the heating/cooling and service schedules for this building rather than reusing equipment quantities from the smaller source product
- Agree all delivery, lifting, assembly, foundations and final-connection responsibilities and costs before payment
- The listing is for a purpose-built modular building, not a converted container, a towable coffee vehicle or a trading-business acquisition
£264,950 is treated as excluding VAT. The building specification includes scheduled partitions, sanitary fittings and heat-pump climate control, but not a fully equipped operating café. Delivery, catering equipment and unitemised services are not free by default. The signed quotation and approved drawings define the complete scope.
How the project progresses
- Define the café brief Send the site postcode, menu, service style, preferred opening date, access details and proposed equipment list.
- Develop the 15.75m × 9.45m plan Coordinate the customer area, counter, preparation, kitchen, storage, sanitary rooms and staff routes from the measured internal space.
- Coordinate catering systems Agree equipment, extraction, replacement air, power, hot water, drainage and any specialist kitchen finishes alongside the included climate-control and sanitary packages.
- Approve specification and complete quotation Confirm the price tax basis, chosen finishes, detailed room and service schedules, optional upgrades and full delivery, lifting, assembly and site-work scope.
- Manufacture, install and hand over Prepare the site and complete the contracted installation, final connections, equipment commissioning and handover documentation before trading.
Frequently asked questions
What is included in this modular cafe building?
The KC Bespoke package includes steel framing, insulated wall/roof/floor assemblies, 100mm internal partition panels, finished SPC flooring, triple-glazed laminated UPVC windows, scheduled entrance and FD30 internal doors, sanitary fittings and finishes, and heat-pump heating and cooling. It is a fitted building specification, not a complete catering equipment package.
How much does the modular cafe building cost?
The supplied £264,950 is treated as excluding VAT under the established listing convention. At the configured 20% rate, VAT is £52,990 and the building amount including VAT is £317,940. Confirm the tax basis and all equipment, services and logistics charges before agreeing the complete project total.
What are the dimensions and seating capacity?
The stated overall size is 15.75m × 9.45m, giving 148.8375m² of footprint, displayed as approximately 148.84m². It is not net usable seating area. Capacity depends on the measured layout, furniture, kitchen, circulation, sanitary provision and project review; no seat or cover count is supplied.
Can the layout include a counter, kitchen, storage and toilets?
These functions can be developed on the agreed plan. Internal partition panels and the scheduled sanitary package are included, but catering counters, kitchen equipment, storage furniture and food-service installations must be specifically itemised and priced. No room or fixture count is assumed.
Are coffee machines and commercial kitchen appliances included?
No equipment inventory is included in the source building specification. Espresso machines, grinders, cooking appliances, refrigeration, dishwashers, display cabinets, catering sinks, worktops and associated equipment require their own schedule and quotation.
Does the included heat pump provide kitchen extraction?
No. The included air-to-air heat pump provides heating and cooling, with specified SCOP 4.5. Cooking-fume extraction, replacement air and general ventilation need a separate design for the menu and equipment. See HSE catering ventilation guidance as an external design reference.
Can this be used as a modular restaurant building?
A restaurant layout can be developed subject to the final kitchen, dining, services, fire/access and food-use design. The term does not add a full cooking line, extract canopy, customer furniture, gas installation or trading approval to the building price.
Is this a container cafe design?
It is a purpose-built steel-frame KC Bespoke modular café building, not a converted freight container. Container cafe design can be a useful comparison search, but actual construction, dimensions, insulation, glazing, lifting and fit-out must be compared. ISO freight-container fittings or stackability are not specified.
Can it be a pop up cafe?
A pop up cafe use can be considered for an agreed site and duration. The building requires an approved transport, supporting-base, utility and operating plan. Temporary use does not imply wheels, daily relocation, a hire rate or exemption from site approvals.
Is this a mobile coffee business for sale?
No. This listing sells a modular café building, not an operating coffee business, van, trailer, franchise, customer list, goodwill or trading pitch. It can form premises for a café operator after site preparation, equipment fit-out and relevant checks; it is not a road-towable mobile coffee unit.
What insulation, glazing and internal finishes are specified?
Walls are specified at 0.18 W/m²K; the 160mm roof assembly with Protan SE 2.0 and insulated floor are specified at 0.11 W/m²K. The floor uses 18mm cement-bonded chipboard and Class 42 SPC. UPVC windows are triple glazed with laminated safety glass, specified at 0.9 W/m²K; aluminium entrance doors at 1.1 W/m²K. Confirm evidence for the complete selected assemblies.
Is the standard SPC flooring suitable for every kitchen area?
Class 42 SPC is the retained base floor finish, not a universal kitchen slip, hygiene or chemical-resistance certification. Review the actual cooking, wet-preparation, washing-up and cleaning conditions and equipment loads. Any alternative floor system or specialist detailing must be explicitly agreed and priced.
Can the exterior colours and cladding be customised?
The listed standard steel-panel and flashing colours are included. Golden Oak, Dark Walnut and Winchester wood-effect finishes, plus the listed brick-slip and decorative-stone systems, remain premium upgrades. Agree material, coverage, support and finish samples before manufacture.
Are electrics, hot water and all plumbing included?
The sanitary fixtures and heat-pump system are included to schedule, but the source does not itemise the entire electrical, lighting, hot-water or catering-plumbing installation. Define supply capacity, equipment loads, water treatment, drainage, testing and connection responsibilities in the order.
Are delivery and on-site assembly included?
Delivery, unloading, lifting, assembly and geographic coverage are not confirmed inclusions. Agree transport sections, route, site access, supports and the full charges before payment. Zero delivery fields in the configuration are unset amounts, not free shipping.
What approvals and food-business checks are needed?
Check planning, Building Regulations and the relevant food-business requirements for the site before ordering. FSA starting-a-food-business guidance is an operational reference for England, Wales and Northern Ireland; consult the relevant Scottish guidance for Scottish sites. A building purchase does not supply registration, a hygiene rating or a trading licence.
Can the café be moved later, and what is the lead time?
Future relocation requires a review of structure, condition, connections, disconnection, lifting, route and the receiving site, and is separately priced. No manufacturing lead time or guaranteed opening date is supplied; the programme follows the approved design, equipment schedules and site review.
Where can I view other modular café buildings?
Browse cafés, kiosks and takeaways or restaurants and bars, and download the KC Bespoke Collection catalogue (PDF). Wider-range examples do not add equipment or features to this specific product.
Related product and compliance guidance
Plan your 15.75m × 9.45m modular café building
Send the site postcode, menu, intended service style, equipment needs and preferred layout. Confirm the £264,950 price tax basis and building package, then agree catering fit-out, extraction, services, delivery, assembly and final connections.
Related products
-

MB24 Portable Office Site Cabin – 24ft × 8ft ISO Frame
£13,950.00- Hospitality Reception Buildings, Modular Retail Units, Offices & Commercial Buildings, Pop-Up Retail Buildings, Rail, Highway & Utility Cabins, Reception Buildings, Sales Suites, Site & Project Offices, Special Offer
-

Modular Padel Clubhouse 6m × 5m with Heat Pump
£49,950.00 View details -

6.3m x 6.5m Bespoke Portable Marketing Suite | KC Modular Buildings
£99,500.00- Cafés, Kiosks & Takeaways, Football, Rugby, Cricket & Bowling Pavilions, Modular Retail Units, Offices & Commercial Buildings, Reception Buildings, Retail, Hospitality & Visitor Buildings, Sales Suites, Showrooms
-

7m × 3.15m Portable Cabin – KC Bespoke
£21,000.00- Clubhouses & Pavilions, Football, Rugby, Cricket & Bowling Pavilions, Garden Offices, Garden Rooms, Modular Retail Units, Offices & Commercial Buildings, Padel & Tennis Clubhouses, Pop-Up Retail Buildings, Reception Buildings, Restaurants & Bars, Sales Suites, Shops & Commercial Units, Showrooms, Site & Project Offices, Special Offer, Sports, Leisure & Community Buildings






