A-Rated ⚡
Heat Pump
In Stock ✓
Modular Padel Clubhouse 6x5m — A-Rated with Heat Pump
|
MPN: KC-MS-CLUBHOUSE-ISO-30
|
As delivered to: Pure Padel, North Leeds
★
★
★
★
5.0 (1 review)
A-rated modular padel clubhouse, 6m × 5m (30m²), with reception, pro shop, toilets and heat pump climate control. ISO-frame construction, 90% factory built, delivered and installed UK-wide. As supplied to Pure Padel at Moor Allerton Golf Club, North Leeds.
£49,950
.00
£19,980.00
£27,472.50
£2,497.50
Full Specifications
✓ Included
- •Steel ISO-frame structure, walls & roof
- •Insulated sandwich panels (KINGSPAN or equiv.)
- •Double/triple-glazed windows & doors
- •Heat pump (heating & cooling)
- •Full electrical installation & LED lighting
- •Reception & pro shop fit-out
- •Male & female WC with sanitary ware
- •Internal finishes (LVT flooring, FIBO panels, emulsion)
- •Factory manufacture (90% completion)
- •UK mainland delivery & installation
✗ Excluded
- •VAT (charged at prevailing rate)
- •Groundworks & foundations
- •Utility connections (water, electric, drainage)
- •External works & landscaping
- •Security systems & CCTV
- •Furniture & signage
- •Surveys, RAMS & lifting plans
- •Planning & building control fees
ⓘ Assumptions
- •Level, prepared foundations ready before delivery
- •Standard UK mainland access (no island/ferry surcharges)
- •Suitable crane access at delivery point
- •Utility connection points within 5m of building
- •Final specification subject to engineering design & site conditions
Why KC Modular Buildings?
Warranty
Certified
Built
Rating
Lead Time
Delivery
Lifespan
& Acclaim
★
★
★
★
“KC Modular Buildings delivered our padel clubhouse at Moor Allerton Golf Club on time and to an exceptional standard. The A-rated building with heat pump keeps running costs remarkably low, and our players love the space. The reception and pro shop layout works perfectly for our operation. From initial enquiry to handover, the team was professional and responsive throughout.”
Project Reference: Pure Padel, North Leeds
Moor Allerton Golf Club, Coal Rd, Leeds LS17 9NH
The Brief
Pure Padel required a purpose-built modular clubhouse at their new North Leeds facility within Moor Allerton Golf Club. The building needed to serve as the operational hub for their padel courts — combining a welcoming reception area, retail pro shop for equipment sales, and toilet facilities for players. Energy efficiency was a priority, with year-round climate control essential for the Yorkshire climate.
The Solution
KC Modular Buildings delivered a 6m × 5m (30m²) A-rated ISO-frame modular clubhouse with heat pump climate control. The building was 90% factory completed, minimising disruption to the golf club grounds. The layout was optimised for padel operations: reception with check-in counter, dedicated pro shop zone, and male/female WC facilities. Insulated sandwich panels and triple glazing ensure low running costs year-round.
Frequently Asked Questions
What is included in the modular padel clubhouse price of £49,950?
The price includes the complete ISO-frame steel structure, insulated sandwich panel walls and roof, double/triple-glazed windows and doors, heat pump climate control, full electrical installation with LED lighting, reception and pro shop fit-out, male and female WC facilities with GEBERIT sanitary ware, internal finishes (LVT flooring, FIBO wall panels), and UK mainland delivery and installation onto prepared foundations. VAT, groundworks, utility connections, external works, security systems, furniture, signage, surveys, and planning/building control fees are excluded.
How long does it take to manufacture and deliver a modular padel clubhouse?
The typical lead time for an ISO-frame modular padel clubhouse is 5–7 weeks from approval of final production drawings. The building is 90% factory completed, so on-site installation is rapid — usually 1–3 days depending on site conditions and crane access.
Is the modular padel clubhouse energy efficient?
Yes. The building achieves an A energy rating with wall U-values of 0.25–0.38 W/m²K and window U-values of 0.5–0.7 W/m²K, fully compliant with Part L 2021 Building Regulations. The heat pump provides efficient year-round heating and cooling, keeping running costs significantly lower than traditional electric or gas systems.
Can the padel clubhouse be relocated in the future?
Yes. The ISO-frame modular construction means the building is fully relocatable. It can be disconnected from services, lifted by crane, and transported to a new site. This makes it an ideal solution for leased land or clubs that may expand to new locations.
What foundations are needed for a modular padel clubhouse?
The building requires level, prepared foundations — typically a concrete pad or screw-pile foundation system. Groundworks and foundations are excluded from the quoted price and should be arranged by the client or their groundworks contractor. KC Modular Buildings can provide foundation specification drawings to assist your contractor.
Do you offer finance for modular padel clubhouses?
Yes. Asset finance is available for commercial clients. Standard payment terms are 40% deposit on order, 55% before delivery, and 5% within 14 days of installation. We can discuss flexible payment arrangements including lease and hire-to-buy options for qualifying businesses.
You May Also Need
Complete your padel facility with these modular solutions
Ready to Build Your Padel Clubhouse?
Speak to our team about your requirements. Every modular padel clubhouse is built to your specification — layout, finishes, and branding tailored to your club.
KC Cabins Solutions Ltd — Company No. 09519774 (England & Wales). Registered Office: Unit 4, Biddulph Road, Chatterley Whitfield, Stoke-on-Trent, ST6 8UW.
All prices exclude VAT unless otherwise stated. Final specification subject to engineering design and site conditions. Images are representative and may show optional extras or site-specific customisations. KC Cabins Solutions Ltd is the modular building supplier and installer — not the main contractor. Groundworks, utility connections, external works, planning and building control fees are the client’s responsibility unless explicitly included in a written quotation.
© 2026 KC Cabins Solutions Ltd trading as KC Modular Buildings. All rights reserved.
Privacy Policy
|
Terms & Conditions

















